Revision history of "MEASURES RELATING TO ENERGY EFFICIENCY AND IMPROVEMENT OF THE SUPPLY OF INSTALLATIONS IN THE BUILDING’S PREMISES OF THE MUNICIPALITY OF ROFRANO" (Q2023502)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:5818:58, 9 October 2024DG Regio talk contribs 52,986 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:5818:58, 9 October 2024DG Regio talk contribs 52,984 bytes −1 Set a claim value: summary (P836): As medidas previstas no projecto final podem ser divididas em duas categorias: A primeira etapa consiste em reduzir a procura actual de energia, com a eficácia dos blocos de construção passivos, que podem ser definidos em: INSULAÇÃO TÉRMICA DO PAVIMENTO DO PAVIMENTO, INSULAÇÃO DE ENCERRAMENTOS VERTICOS EXTERIORES, INSULAÇÃO TÉRMICA DA PRIMEIRA LINHA DO PAVIMENTO (INSULAÇÃO A VÓLUMES NÃO AQUECIDOS/ARREFECIDOS) E A SUBSTITUIÇÃO DE PAVIMENTOS EXTERNOS...

7 March 2024

14 June 2023

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 01:1401:14, 5 July 2022DG Regio talk contribs 50,377 bytes +31,444 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

29 December 2020

2 November 2020

25 September 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:4109:41, 23 March 2020DG Regio talk contribs 9,050 bytes +934 Created claim: summary (P836): THE MEASURES ENVISAGED IN THE FINAL DRAFT CAN BE BROKEN DOWN INTO TWO CATEGORIES: THE FIRST STEP IS TO REDUCE THE CURRENT DEMAND FOR ENERGY, WITH THE EFFICIENCY OF PASSIVE BUILDING BLOCKS, WHICH CAN BE DEFINED IN: THERMAL INSULATION OF THE ROOF FLOOR, INSULATION OF VERTICAL EXTERIOR CLOSURES, THERMAL INSULATION OF THE FIRST FLOOR LINE (INSULATING TO NON-HEATED/COOLED VOLUMES) AND THE REPLACEMENT OF EXTERNAL WINDOWS BY EFFICIENT SYSTEMS WHICH ARE...

20 March 2020

17 March 2020

12 March 2020

6 March 2020