Revision history of "INTEGRATED PROJECT FOR MEASURES AIMED AT BUILDING RENEWABLE ENERGY PRODUCTION FACILITIES © 'FOR THE RENOVATION AND REPLACEMENT OF AIR TREATMENT PLANTS SERVING THE MUNICIPAL PROPERTY OF THE MUNICIPALITY" (Q2023499)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:5818:58, 9 October 2024DG Regio talk contribs 57,335 bytes +10 Changed label, description and/or aliases in pt
  • curprev 18:5818:58, 9 October 2024DG Regio talk contribs 57,325 bytes −8 Set a claim value: summary (P836): O PROJECTO INTEGRADO ABRANGE MEDIDAS DESTINADAS À CONSTRUÇÃO DE INSTALAÇÕES PARA A PRODUÇÃO DE ENERGIA RENOVÁVEL E À RENOVAÇÃO E SUBSTITUIÇÃO DE INSTALAÇÕES DE TRATAMENTO AÉREO QUE SERVEM A RECOLHA PRÓPRIA MUNICÍPIA. As medidas podem ser adoptadas em cinco tipos: (1) EDIFÍCIOS A CONSTRUIR NO ÂMBITO DOS EDIFÍCIOS: a) Cobertura, b) substituição de janelas exteriores de tipo cortador de calor em janelas térmicas, 2) construção de um sistema fotovoltaic...

7 March 2024

14 June 2023

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 01:1401:14, 5 July 2022DG Regio talk contribs 54,213 bytes +35,309 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

10 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

2 November 2020

25 September 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:4109:41, 23 March 2020DG Regio talk contribs 9,160 bytes +1,028 Created claim: summary (P836): THE INTEGRATED PROJECT COVERS MEASURES AIMED AT BUILDING INSTALLATIONS FOR THE PRODUCTION OF RENEWABLE ENERGY AND THE RENOVATION AND REPLACEMENT OF AIR TREATMENT PLANTS SERVING THE MUNICIPAL OWNED COLLECTION. THE MEASURES MAY BE ENCLOSED IN FIVE TYPES: (1) BUILDINGS TO BE BUILT ON THE BUILDING ENVELOPE: (A) COVER COVER, (B) REPLACEMENT OF OUTSIDE WINDOWS OF HEAT CUT TYPE IN THERMAL WINDOWS, (2) CONSTRUCTION OF A PHOTOVOLTAIC SYSTEM OF 18 KW, (3)...

20 March 2020

17 March 2020

12 March 2020

6 March 2020