Revision history of "MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND PORT SYSTEM OF NAPOL’ A3 — SURFACE CLEAN-UP OF UNEXPLODED REMNANTS OF WAR ON THE AREAS AFFECTED BY THE CABLE" (Q2023264)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 June 2023

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 01:0801:08, 5 July 2022DG Regio talk contribs 56,696 bytes +37,587 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

10 February 2022

9 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:2409:24, 23 March 2020DG Regio talk contribs 9,782 bytes +1,215 Created claim: summary (P836): THE FIRST ACTIVITY WILL BE THAT OF THE EXISTING SURVEY OF THE EXISTING BATHYMETRIC EXISTING IN ORDER TO OPTIMISE THE USE OF SEARCH AND MAPPING TOOLS FOR POSSIBLE EXPLOSIVE REMNANTS OF WAR. SUBSEQUENTLY, A SURVEY WITH THE APPROPRIATE INSTRUMENTS FOR IDENTIFYING THE TARGETS HELD IN THE FONEAPOI IS EXPECTED TO BE CARRIED OUT IN THE ‘TARGET AREAS’ IDENTIFIED WITH THE PREVIOUS INSTRUMENTATION TO DETECT METAL OBJECTS. AT THE END OF THE VERIFICATION,...

17 March 2020

12 March 2020

6 March 2020