Revision history of "HYDRAULIC SHELTER FOR SURFACE LANDSLIDE MOVEMENTS IN THE PUBLIC BAND, UPSTREAM AND DOWNSTREAM, OF THE UPSTREAM AND DOWNSTREAM OF MONTERVERGINE-ACQUA OF THE VEINS — BENEFICIARY OF THE COMMUNITIES OF THE PARTENO AND VALLO DI LAURO" (Q2023241)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 06:0806:08, 10 October 2024DG Regio talk contribs 56,808 bytes +132 Changed label, description and/or aliases in pt
  • curprev 06:0806:08, 10 October 2024DG Regio talk contribs 56,676 bytes −21 Set a claim value: summary (P836): PROJECTO DESTINADO À REABILITAÇÃO, CONSTRUÇÃO E SEGURANÇA DA ESTRADA PRINCIPAL (MONTVERINA — ÁGUA DOS VEÍCULOS) E DE ALGUNS DOS GRANDES CAMINHÕES DO AIB QUE ESTÃO EM CONEXÃO COM A RECEPÇÃO SUPERIOR. PROVIDES FOR THE RE-FUNCTIONING AND SAFETY OF THE CARRIAGEWAY OF THE ROAD THROUGH THE PARTIAL REFURBISHMENT OF THE OLD BALLAST AND THE CORRESPONDING NEW CONSTRUCTION OF THE ASPHALT CONCRETE, THE RESTORATION OF EXISTING MANHOLES AND DRAINS, AND NEW PIPES...

7 March 2024

14 June 2023

12 June 2023

26 April 2023

8 April 2023

1 July 2022

  • curprev 14:4114:41, 1 July 2022DG Regio talk contribs 54,091 bytes +35,187 Changed label, description and/or aliases in ga, el, pt, bg, fi, mt, sv, lv, da, pl, cs, lt, hu, sl, ro, sk, hr, et, nl, fr, de, es, and other parts: Adding translations: ga, el, pt, bg, fi, mt, sv, lv, da, pl, cs, lt, hu, sl, ro, sk, hr, et,

10 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:2409:24, 23 March 2020DG Regio talk contribs 10,098 bytes +1,043 Created claim: summary (P836): PROJECT AIMING AT REHABILITATION, UPGRADING AND SECURING OF THE MAIN ROAD (MONTVERINE — WATER OF THE VEINS) AND SOME OF THE MAJOR AIB RUNWAYS WHICH CONNECT TO THE ABOVE BACKBONE. PROVIDES FOR THE RE-FUNCTIONING AND SAFETY OF THE CARRIAGEWAY OF THE ROAD THROUGH THE PARTIAL REFURBISHMENT OF THE OLD BALLAST AND THE CORRESPONDING NEW CONSTRUCTION OF THE ASPHALT CONCRETE, THE RESTORATION OF EXISTING MANHOLES AND DRAINS, AND NEW PIPES ADAPTED TO THE F...

20 March 2020

17 March 2020

12 March 2020

6 March 2020