Revision history of "ENERGY EFFICIENCY OF THE IPES BUILDING IN THE TURES FIELD, VIA PANULAN 5-6" (Q2022811)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 06:0806:08, 10 October 2024DG Regio talk contribs 57,043 bytes +21 Changed label, description and/or aliases in pt
  • curprev 06:0806:08, 10 October 2024DG Regio talk contribs 57,022 bytes +15 Set a claim value: summary (P836): O meu edifício, incluindo 14 unidades, foi construído em 1982-1983. A MANUTENÇÃO EXTRAORDINÁRIA INCLUI:\ N- REABILITAÇÃO DO EDIFÍCIO\ N- REABILITAÇÃO DE FACADES E BALCONES\ ADAPTAÇÃO DAS INSTALAÇÕES ELÉCTRICAS\ N- ADAPTAÇÃO DA GARAGEM SUBTERRÂNEA ÀS REGULAMENTAÇÕES RELATIVAS À SEGURANÇA DOS INCÊNDIOS\ NLE MURAS EXTERNAS SERÃO ISOLADAS POR MEIOS DE UMA LINHA DE ROCHA DE 16 CM (ROCKWOOL). Aplicar-se-á um isolamento térmico perímetro em linha com a bas...

23 March 2024

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 00:5700:57, 5 July 2022DG Regio talk contribs 53,885 bytes +35,460 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:4708:47, 23 March 2020DG Regio talk contribs 9,696 bytes +1,235 Created claim: summary (P836): MY BUILDING, INCLUDING 14 UNITS, WAS BUILT IN 1982-1983. EXTRAORDINARY MAINTENANCE INCLUDES:\ N- REHABILITATION OF THE BUILDING\ N- REHABILITATION OF FACADES AND BALCONIES\ ADAPTATION OF THE ELECTRICAL INSTALLATIONS\ N- ADAPTATION OF THE UNDERGROUND GARAGE TO THE FIRE SAFETY REGULATIONS\ NLE OUTSIDE WALLS WILL BE ISOLATED BY MEANS OF A 16 CM LAYER OF ROCK WOOL (ROCKWOOL). A PERIMETER THERMAL INSULATION SHALL BE APPLIED IN LINE WITH THE BASE TO B...

17 March 2020

12 March 2020

6 March 2020