Revision history of "ENERGY EFFICIENCY OF A CLOSED IPES BUILDING, VIA SEEBGG 30" (Q2022809)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 06:0806:08, 10 October 2024DG Regio talk contribs 58,112 bytes +6 Changed label, description and/or aliases in pt
  • curprev 06:0806:08, 10 October 2024DG Regio talk contribs 58,106 bytes +18 Set a claim value: summary (P836): Os meus edifícios residenciais serão propriedade dos IPES e serão constituídos por 3 DWELLINGS. A BASE É RESPONSÁVEL PELAS CELARES E PELAS QUARTAS TÉCNICAS; No rés-do-chão e no primeiro andar, distribuem-se as três unidades habitacionais, uma das quais é dupla. THE CONSOLIDATION PLAN MAINLY INCLUDES THE ENERGY RENOVATION OF THE BUILDING.\ NIN DETAIL, THE FOLLOWING WORKS WILL BE CARRIED OUT:\ N- APPLICATION OF THE PERIMETER WALLS\ N- INSULATION OF TH...

23 March 2024

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 00:5700:57, 5 July 2022DG Regio talk contribs 54,966 bytes +36,259 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:4708:47, 23 March 2020DG Regio talk contribs 9,760 bytes +1,314 Created claim: summary (P836): MY RESIDENTIAL BUILDINGS WILL BE OWNED BY THE IPES AND CONSIST OF 3 DWELLINGS. THE BASEMENT IS RESPONSIBLE FOR THE CELLARS AND THE TECHNICAL ROOMS; ON THE GROUND FLOOR AND THE FIRST FLOOR, THE 3 HOUSING UNITS ARE DISTRIBUTED, ONE OF WHICH IS A DUPLEX. THE CONSOLIDATION PLAN MAINLY INCLUDES THE ENERGY RENOVATION OF THE BUILDING.\ NIN DETAIL, THE FOLLOWING WORKS WILL BE CARRIED OUT:\ N- APPLICATION OF THE PERIMETER WALLS\ N- INSULATION OF THE WINE...

17 March 2020

12 March 2020

6 March 2020