Revision history of "CHIEF OF BENEVENTO III — PONTELANDOLFO" (Q2021719)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:4106:41, 9 October 2024DG Regio talk contribs 48,804 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:4106:41, 9 October 2024DG Regio talk contribs 48,805 bytes −5 Set a claim value: summary (P836): Os trabalhos em causa dizem respeito à construção de uma nova linha eléctrica de 150 KV entre a S.E. de PONTELANDOLFO e a S.E. III por uma TERNA ARMADA SIMPLES, com três passagens, cada uma constituída por um feixe de dois condutores de energia e duas cordas de chamada, até ao nível da mesma estrutura com as batidas dos condutores, entre o suporte terminal e os portais de estação. O projecto será caracterizado por soluções inovadoras, tais como DTR,...

20 March 2024

14 June 2023

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 00:4000:40, 5 July 2022DG Regio talk contribs 45,629 bytes +29,244 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

9 February 2022

7 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

29 December 2020

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:5308:53, 23 March 2020DG Regio talk contribs 8,910 bytes +906 Created claim: summary (P836): THE WORK IN QUESTION CONCERNS THE CONSTRUCTION OF A NEW 150 KV OVERHEAD POWER LINE TERNA BETWEEN THE S.E. OF PONTELANDOLFO AND S.E. III BY A SIMPLE TERNA ARMED TERNA, WITH THREE STEPS EACH CONSISTING OF A BEAM OF 2 ENERGY CONDUCTORS AND TWO ROPES ON CALL, UP TO THE LEVEL OF THE SAME STRUCTURE WITH BEATS OF CONDUCTORS, BETWEEN THE TERMINAL SUPPORT AND THE STATION PORTALS. THE PROJECT WILL BE CHARACTERISED BY INNOVATIVE SOLUTIONS SUCH AS DTR, WEAT...

20 March 2020

17 March 2020

12 March 2020

6 March 2020