Revision history of "DIRECTOR CATANZARO-LOCRI" (Q2021717)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 June 2023

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 00:4000:40, 5 July 2022DG Regio talk contribs 53,387 bytes +34,752 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

9 February 2022

7 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:5308:53, 23 March 2020DG Regio talk contribs 9,572 bytes +1,229 Created claim: summary (P836): THE MEASURES WHICH MAKE UP THIS PROJECT CONSIST OF THE IMPLEMENTATION OF ‘SMART FUTURE TRANSMISSION SYSTEM’ THROUGH THE INSTALLATION OF INNOVATIVE HIGH TEMPERATURE CONDUCTORS WHICH WILL: INCREASING THE CAPACITY TO TRANSMIT, FROM ONE POINT TO THE OTHER OF THE TRANSMISSION NETWORK ITSELF AND BETWEEN THE TRANSMISSION NETWORK AND THE DISTRIBUTION NETWORKS, ALL THE INFORMATION THAT IS ESSENTIAL FOR THE ACTIVE MANAGEMENT OF THE ELECTRICITY SYSTEM AND...

20 March 2020

17 March 2020

12 March 2020

6 March 2020