Revision history of "ELECTRIC STATION PICERNO" (Q2021711)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 17:0317:03, 10 October 2024DG Regio talk contribs 51,668 bytes +3 Changed label, description and/or aliases in pt
  • curprev 17:0317:03, 10 October 2024DG Regio talk contribs 51,665 bytes +10 Set a claim value: summary (P836): A INTERVENÇÃO RESPEITA À CONSTRUÇÃO DE UMA NOVA ESTAÇÃO DE REDE FERROVIÁRIA DUPLA DE 150 KV A INTEGRAR NA ENTRA-ESEC NO NOVO «CP TITO SMISTINGTO-CP AVILIANO» E «CP TITO SMISTINGTO-TANAGRO» DE 150 KV. A CONSTRUÇÃO DA PRESENTE ESTAÇÃO É NECESSÁRIA PARA AUMENTAR A L’AFIDABILIDADE NUM ESPAÇO EM QUE EXISTE UM ALTO PEDIDO DE LIGAÇÕES (479 MW NA REDE TA E 6 MW NA REDE BTBT), QUE, NA AUSÊNCIA DO TRABALHO EM QUESTÃO, NÃO PODE SER COLOCADO NA REDE EM FUNÇÃO D...

20 March 2024

14 June 2023

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 00:3900:39, 5 July 2022DG Regio talk contribs 48,474 bytes +31,486 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

9 February 2022

7 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

29 December 2020

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:5308:53, 23 March 2020DG Regio talk contribs 9,424 bytes +1,084 Created claim: summary (P836): THE INTERVENTION CONCERNS THE CONSTRUCTION OF A NEW 150 KV DOUBLE RAIL NETWORK STATION TO BE INTEGRATED INTO ENTRA-ESEC ON THE NEW 150 KV ‘CP TITO SMISTINGTO-CP AVILIANO’ AND ‘CP TITO SMISTINGTO-TANAGRO’. THE CONSTRUCTION OF THIS STATION IS NECESSARY TO INCREASE L’AFFIDABILITY IN AN AREA WHERE THERE IS A HIGH DEMAND FOR CONNECTIONS (479 MW ON THE TA NETWORK AND 6 MW ON THE BTBT NETWORK), WHICH, IN THE ABSENCE OF THE WORK IN QUESTION, CANNOT BE P...

20 March 2020

17 March 2020

12 March 2020

6 March 2020