Revision history of "SMART GRID PROJECT OF THE PRIME CABIN BIRGI" (Q2017744)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:4804:48, 11 October 2024DG Regio talk contribs 58,282 bytes +5 Changed label, description and/or aliases in pt
  • curprev 04:4804:48, 11 October 2024DG Regio talk contribs 58,277 bytes +9 Set a claim value: summary (P836): O projecto abrange medidas estruturais e operacionais para as grelhas inteligentes. As medidas estruturais têm por objectivo alterar a concepção da instalação, a fim de melhorar as condições de funcionamento e a concepção da instalação. A conceção da instalação deve consistir na utilização de dispositivos de tipo «estado-da-arte» que permitam a completa inteligência da cabina primária e das cabinas subjacentes. Além disso, as linhas MT serão substit...

7 March 2024

14 June 2023

11 June 2023

26 April 2023

8 April 2023

4 July 2022

  • curprev 23:1423:14, 4 July 2022DG Regio talk contribs 55,657 bytes +37,020 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

9 February 2022

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

2 November 2020

14 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:5208:52, 23 March 2020DG Regio talk contribs 9,667 bytes +1,306 Created claim: summary (P836): THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL CONSIST OF THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN AND THE UNDERLYING CABS. IN ADDITION, THE MT LINES WILL B...

20 March 2020

17 March 2020

12 March 2020

6 March 2020