Revision history of "SMART GRID PRIMARY CAB PROJECT" (Q2017734)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:4006:40, 9 October 2024DG Regio talk contribs 59,625 bytes +6 Changed label, description and/or aliases in pt
  • curprev 06:4006:40, 9 October 2024DG Regio talk contribs 59,619 bytes +34 Set a claim value: summary (P836): O projecto abrange medidas estruturais e operacionais para as grelhas inteligentes. As medidas estruturais têm por objectivo alterar a concepção da instalação, a fim de melhorar as condições de funcionamento e a concepção da instalação. A conceção da instalação deve consistir na utilização de dispositivos de tipo «estado-da-arte» que permitam a completa inteligência da cabina primária e das cabinas subjacentes. Além disso, as novas linhas MT serão i...

20 March 2024

14 June 2023

11 June 2023

26 April 2023

8 April 2023

4 July 2022

  • curprev 23:1323:13, 4 July 2022DG Regio talk contribs 56,974 bytes +38,225 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

9 February 2022

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

29 December 2020

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:5208:52, 23 March 2020DG Regio talk contribs 9,715 bytes +1,365 Created claim: summary (P836): THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL CONSIST OF THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN AND THE UNDERLYING CABS. IN ADDITION, NEW MT LINES WILL...

20 March 2020

17 March 2020

12 March 2020

6 March 2020