Revision history of "SMART GRID PROJECT OF PRIMARY CALITRI" (Q2017732)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:5518:55, 9 October 2024DG Regio talk contribs 58,971 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:5518:55, 9 October 2024DG Regio talk contribs 58,969 bytes +27 Set a claim value: summary (P836): O projecto abrange medidas estruturais e operacionais para as grelhas inteligentes. As medidas estruturais têm por objectivo alterar a concepção da instalação, a fim de melhorar as condições de exercício e de execução da instalação. A concepção da instalação consistirá na utilização dos últimos dispositivos de geração que permitam a modelização do CAB PRIMÁRIO, das CABS SECUNDÁRIAS e dos CENTROS DE SATÉLITE SUBJACENTES. Além disso, as novas linhas M...

23 March 2024

11 June 2023

26 April 2023

8 April 2023

4 July 2022

  • curprev 23:1323:13, 4 July 2022DG Regio talk contribs 56,331 bytes +37,564 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

9 February 2022

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:5208:52, 23 March 2020DG Regio talk contribs 9,692 bytes +1,338 Created claim: summary (P836): THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE INSTALLATION IN ORDER TO IMPROVE THE CONDITIONS FOR THE EXERCISE AND PERFORMANCE OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL CONSIST OF THE USE OF LAST GENERATION DEVICES ENABLING SMARTIFICATIONS OF THE PRIMARY CAB, OF THE SECONDARY CABS AND OF THE UNDERLYING SATELLITE CENTRES. IN ADD...

20 March 2020

17 March 2020

12 March 2020

6 March 2020