Revision history of "SMART GRID/NEW PRIMARY CABIN GAS PROJECT" (Q2017704)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

11 June 2023

26 April 2023

8 April 2023

1 July 2022

  • curprev 13:2313:23, 1 July 2022DG Regio talk contribs 56,592 bytes +37,866 Changed label, description and/or aliases in ga, el, pt, bg, fi, mt, sv, lv, da, pl, cs, lt, hu, sl, ro, sk, hr, et, nl, fr, de, es, and other parts: Adding translations: ga, el, pt, bg, fi, mt, sv, lv, da, pl, cs, lt, hu, sl, ro, sk, hr, et,

11 February 2022

9 February 2022

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

29 December 2020

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:5208:52, 23 March 2020DG Regio talk contribs 9,713 bytes +1,350 Created claim: summary (P836): THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE INSTALLATION IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL INCLUDE THE USE OF LAST GENERATION DEVICES ENABLING SMARTIFICATIONS OF THE PRIMARY CAB, OF THE SECONDARY CABS AND OF THE UNDERLYING SATELLITE CENTRES. IN...

20 March 2020

17 March 2020

12 March 2020

6 March 2020