Revision history of "GIOIA TAURO: RAILWAY GATEWAY" (Q2017473)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

4 July 2022

  • curprev 23:0623:06, 4 July 2022DG Regio talk contribs 55,632 bytes +37,093 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:2908:29, 23 March 2020DG Regio talk contribs 9,544 bytes +1,274 Created claim: summary (P836): THE TERMINAL DESIGN COMPRISES LÂ TO EQUIP THEM WITH A GROUP OF TRACK BEAMS (N.4) DIVIDED INTO TWO SEPARATE AREAS FOR THE TREATMENT OF GOODS RESPECTIVELY TO THE NATIONAL AND FOREIGN STATE, AS WELL AS STORAGE AND EXCHANGE AREAS FOR A TOTAL AREA OF 269.000 M² FOR THE HANDLING OF NATIONALISED AND 132.000 M² OF CARGO TO THE FOREIGN STATE. THIS INTERVENTION AIMS TO RATIONALISE THE HANDLING OF RAILWAY TRAINS AGAINST THE CURRENT ATTITUDE TOWARDS THE CUR...

20 March 2020

17 March 2020

12 March 2020

6 March 2020