Revision history of "MESSINA HARBOUR Â OF THE TREMECRAFT LOGISTICS PLATFORM WITH PORT CALL ATTACHED" (Q2017459)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:5618:56, 9 October 2024DG Regio talk contribs 48,965 bytes −3 Changed label, description and/or aliases in pt
  • curprev 18:5618:56, 9 October 2024DG Regio talk contribs 48,968 bytes −24 Set a claim value: summary (P836): CONSTRUÇÃO DE UMA PLACA INTERMODAL COM VABILIDADE PARA ACESSO DIRETO A PARTIR DA JUNÇÃO DA AUTOMÓVEL TREMEKLANDS, DE UM PARQUE DE ESTACIONAMENTO DE CRUQUES (30.000 M2) E DE AUTOMÓVEIS DE PASSAGEIROS (5 M2) E DO NOVO SISTEMA PORTUÁRIO EM EXTENSÃO AO NOVO SISTEMA PORTUÁRIO EXISTENTE QUE ACOSTA FERRAS OU N.4 PARA NAVIOS RO-RO. O projecto inclui, na medida em que a atenuação funciona, o reforço costeiro no Norte, livre e protegido (com recurso a sedimen...

7 March 2024

12 June 2023

26 April 2023

8 April 2023

4 July 2022

  • curprev 23:0623:06, 4 July 2022DG Regio talk contribs 46,386 bytes +30,081 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:2908:29, 23 March 2020DG Regio talk contribs 8,876 bytes +864 Created claim: summary (P836): CONSTRUCTION OF AN INTERMODAL PLATE WITH VABILITY FOR DIRECT ACCESS FROM THE TREMEKLANDS MOTORWAY JUNCTION, A TRUCK PARKING YARD (30.000 M²) AND PASSENGER CARS (5 M²) AND THE NEW PORT SYSTEM IN EXTENSION TO THE EXISTING NEW PORT SYSTEM ACCOSTING FERRIES OR N.4 FOR RO-RO SHIPS. THE PROJECT INCLUDES AS MITIGATION WORKS THE COASTAL REPLENISHMENT IN THE NORTH, BOTH FREE AND PROTECTED (USING DREDGED SEDIMENTS IN THE PORT AREA) AND RESTORED RENATURALI...

20 March 2020

17 March 2020

12 March 2020

6 March 2020