Revision history of "INSOLVENCY SYSTEM Â TOWARDS BRINDISI ACC" (Q2017439)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

4 July 2022

  • curprev 23:0623:06, 4 July 2022DG Regio talk contribs 50,468 bytes +33,279 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

29 December 2020

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:2908:29, 23 March 2020DG Regio talk contribs 9,234 bytes +1,156 Created claim: summary (P836): THE PURPOSE OF THIS TECHNOLOGICAL INTERVENTION IS TO DESIGN, DEVELOP AND IMPLEMENT EXACTLY THE UPGRADE OF THE BACK-UP SYSTEM USED, IN THE CASE OF LENÂ 'ACC OF BRINDISI, TO CONTROL AIR TRAFFIC IN THE CASE OF INDISPONITBILITY OF THE PRIMARY SYSTEM. THIS INTERVENTION AIMS TO ENSURE THAT THE SYSTEM OF THE SYSTEM OF THE OPERATING SYSTEM FOR THE SOFTWARE OF THE SDPS SUBSYSTEM IS REPLICATED, IN THE SAME SCENARIO, ALSO IN THE SYSTEM Â OF THE SBPS SUBSYS...

20 March 2020

17 March 2020

12 March 2020

6 March 2020