Revision history of "ACCELERATION OF THE ROUTE — ROUTE BIOCOCCA-ARGUS" (Q2017425)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 19:1419:14, 8 October 2024DG Regio talk contribs 61,005 bytes −2 Changed label, description and/or aliases in pt
  • curprev 19:1419:14, 8 October 2024DG Regio talk contribs 61,007 bytes −33 Set a claim value: summary (P836): A INTERVENÇÃO FOI REALIZADA DA 1 ^ BICOCCA FUNCTIONAL LOT — AUGUSTA — QUE CORRESPONDE À 2 FASE DO AP. A EXECUÇÃO DO BICOCCA VIIAUGUSTA PREVISTA AS SEGUINTES PRINCIPAIS MEDIDAS: Torna-se 7 VARIANTES; Â — ADAPTAÇÕES A OBRAS EXISTENTES PARA GARANTIR QUE AS OBRAS SÃO REALIZADAS PARA GARANTIR QUE AS OBRAS SÃO REALIZADAS ELECTRÓNICAMENTE (DICAS DE SEGURANÇA, DADOS DE CONTACTO, ETC.); DE ESTABILIZAÇÃO DAS ESCOLHAS (CURDLING, RUNNING WALLS, DISGAGGIO OF BLO...

7 March 2024

12 June 2023

26 April 2023

8 April 2023

12 December 2022

4 July 2022

  • curprev 23:0523:05, 4 July 2022DG Regio talk contribs 59,239 bytes +36,813 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

11 February 2022

9 February 2022

8 February 2022

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

2 November 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:2908:29, 23 March 2020DG Regio talk contribs 9,325 bytes +1,408 Created claim: summary (P836): THE INTERVENTION WAS MADE UP OF THE 1 ^ BICOCCA FUNCTIONAL LOT — AUGUSTA — WHICH CORRESPONDS TO THE 2 PHASE OF THE PG. THE IMPLEMENTATION OF THE BICOCCA Â VIIAUGUSTA PROVIDES FOR THE FOLLOWING MAIN MEASURES: Â BECOMES 7 VARIANTS; Â — ADAPTATIONS TO EXISTING WORKS TO ENSURE THAT THE WORKS ARE CARRIED OUT IN ORDER TO ENSURE THAT THE WORKS ARE CARRIED OUT ELECTRONICALLY (SECURITY DITCHES, CONTACT DETAILS, ETC.); Â OF STABILISATION OF THE SLOPES (C...

20 March 2020

17 March 2020

12 March 2020

6 March 2020