Revision history of "THE CCS NODE OF PALERMO" (Q2017419)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 06:0706:07, 10 October 2024DG Regio talk contribs 50,440 bytes −2 Set a claim value: summary (P836): CONCLUSÃO DA EXECUÇÃO DE UMA PRIMEIRA FASE DO SISTEMA DE CONTROLO E CONTROLO DO SISTEMA DE CONTROLO DO TRÁFEGO FERROVIÁRIO DA JUNÇÃO PALERMO NO CENTRO DE UMA ESTAÇÃO CENTRAL SITUADA EM PALERMO E POR ESTAÇÕES MAIS PERIFÉRICAS A PRESENTE INTERVENÇÃO É ATIVADA PELA PRÓXIMA ETAPA: A VIA ENTRE FIUMETORTO — PALERMO, NA FASE DA FASE, A ILHA DE EXATAMENTE ESTA FASE DO PONTO DE ABATE, QUE ESTÁ NA FASE DA FASE, E A SECÇÃO DE PALERMO, QUE SE TORNOU UMA ILHA DE...

7 March 2024

12 June 2023

26 April 2023

8 April 2023

4 July 2022

  • curprev 23:0523:05, 4 July 2022DG Regio talk contribs 47,803 bytes +31,297 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 June 2022

  • curprev 09:4909:49, 15 June 2022Musmero talk contribs 16,506 bytes −19 Changed claim: summary (P836): COMPLETAMENTO DELLA REALIZZAZIONE DI UNA PRIMA FASE DEL SISTEMA DI COMANDO E CONTROLLO DELLA CIRCOLAZIONE FERROVIARIA DEL NODO DI PALERMO COSTITUITO DA UN POSTO CENTRALE UBICATO A PALERMO E DA PIù POSTI PERIFERICI. L'INTERVENTO VIENE ATTIVATO PER STEP SUCCESSIVI: LA TRATTA FIUMETORTO -PALERMO IN I FASE, LA TRATTA ISOLA DELLE FEMMINE -PUNTA RAISI IN II FASE E LA TRATTA PALERMO - ISOLA DELLE FEMMINE IN III FASE. LA REALIZZAZIONE DELL'INTERVENTO É...

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:2908:29, 23 March 2020DG Regio talk contribs 9,112 bytes +1,128 Created claim: summary (P836): COMPLETION OF THE IMPLEMENTATION OF A FIRST PHASE OF THE SYSTEM FOR THE CONTROL AND CONTROL OF THE RAIL TRAFFIC CONTROL SYSTEM OF THE PALERMO JUNCTION IN THE CENTRE OF A CENTRAL STATION LOCATED IN PALERMO AND BY MORE PERIPHERAL STATIONS. THIS INTERVENTION IS ACTIVATED BY THE NEXT STEP: THE ROUTE BETWEEN FIUMETORTO — PALERMO, AT THE STAGE AT THE STAGE, THE ISLAND OF EXACTLY THIS PHASE OF THE POINT OF SLAUGHTER, WHICH IS AT THE STAGE OF THE PHASE,...

17 March 2020

12 March 2020

6 March 2020