Revision history of "BARI NODE: ACC BARI NORTH PARK AND ENTRY INTO VARIANT IN CENTRAL BARI" (Q2017405)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:5618:56, 9 October 2024DG Regio talk contribs 48,885 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:5618:56, 9 October 2024DG Regio talk contribs 48,883 bytes −19 Set a claim value: summary (P836): O PROJETO PREVISTA A CONSTRUÇÃO DO NOVO SISTEMA DE COMPUTADOR CENTRAL ACC DO PARQUE NORTE DE BARI E A DOUBLAÇÃO DA ENTRADA PARALELA PARA BARI C. THE BARI — TARANTO TRAVELLER LINE. A intervenção contribuirá para o reforço global da linha BARI-TARANTO através: — SÍMBOLO DE CAPACIDADE DE TRÁFEGO AUMENTADA; — O AUMENTO DO REGULAMENTO DE VIAGEM; — RACIONALIZAÇÃO DOS PROCESSOS DE CIRCULAÇÃO. Nomeadamente, a entrada da variedade em BARI central contribui p...

7 March 2024

12 June 2023

26 April 2023

8 April 2023

4 July 2022

  • curprev 23:0523:05, 4 July 2022DG Regio talk contribs 45,757 bytes +29,404 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

8 February 2022

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:2908:29, 23 March 2020DG Regio talk contribs 8,962 bytes +939 Created claim: summary (P836): THE PROJECT PROVIDES FOR THE CONSTRUCTION OF THE NEW CENTRAL COMPUTER SYSTEM ACC OF THE NORTHERN PARK OF BARI AND THE DOUBLING OF THE PARALLEL ENTRY TO BARI C.THE BARI — TARANTO TRAVELLER LINE. THE INTERVENTION SHALL CONTRIBUTE TO THE OVERALL REINFORCEMENT OF THE LINE BARI-TARANTO THROUGH: — SYMBOL OF INCREASED TRAFFIC CAPACITY; — THE INCREASE IN THE REGULATION OF TRAVEL; — RATIONALISATION OF CIRCULATION PROCESSES. IN PARTICULAR, THE IMPLEMENTAT...

17 March 2020

12 March 2020

6 March 2020