Revision history of "DOUBLE BARI — S. ANDREA BITETTO" (Q2017401)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 17:0217:02, 10 October 2024DG Regio talk contribs 60,712 bytes −21 Set a claim value: summary (P836): A intervenção consiste em duplicar a secção ferroviária "BARI S. ANDREA ' BITETTO" (10,5 km), situada ao longo da rota "BARI ' TARANTO". A SECÇÃO BARI S. ANDREA "BITETTO" É A ÚLTIMA SECÇÃO NECESSÁRIA PARA COMPLETAR A DUPLICAÇÃO DA LINHA BARI-TARANTO, DUPLICAÇÃO INDISPENSÁVEL PELO TOTAL DESENVOLVIMENTO DOS TRANSPORTES FERROVIÁRIOS A NÍVEL REGIONAL E AO NÍVEL DE LIGAÇÃO ENTRE AS ZONAS PRODUTORAS E COMERCIAIS DA ÁULIA E DA CALÁBRIA E O RESTO DA EUROPA....

7 March 2024

28 June 2023

12 June 2023

26 April 2023

8 April 2023

10 March 2023

9 March 2023

4 July 2022

  • curprev 23:0523:05, 4 July 2022DG Regio talk contribs 57,318 bytes +37,246 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

8 February 2022

7 February 2022

24 January 2022

24 December 2021

22 December 2021

14 December 2021

29 September 2021

  • curprev 09:5509:55, 29 September 2021Wildmax talk contribs 11,391 bytes −404 Changed claim: summary (P836): THE INTERVENTION CONSISTS IN DOUBLING THE "BARI S. ANDREA ' BITETTO" RAILWAY SECTION (10.5 KM), SITUATED ALONG THE "BARI ' TARANTO" ROUTE. THE BARI S. ANDREA ' BITETTO SECTION IS THE LAST SECTION NECESSARY FOR COMPLETING DOUBLING OF THE BARI-TARANTO LINE, DOUBLING INDISPENSABLE FOR FULL DEVELOPMENT OF RAIL TRANSPORT BOTH AT THE REGIONAL LEVEL AND AT THE LEVEL OF CONNECTION BETWEEN THE PRODUCTIVE AND COMMERCIAL AREAS OF APULIA AND CALABRIA AND TH...

2 November 2020

15 July 2020

16 June 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:2908:29, 23 March 2020DG Regio talk contribs 10,113 bytes +1,737 Created claim: summary (P836): THIS INTERVENTION CONSISTS OF THE DOUBLING OF THE RAIL SECTION ‘BARI S. SANTA BITETTO’ (10.5 KM) ALONG THE DIRECTOR ‘BARI Â’ TARANTO’. THE BARI SAN ANDREA SPHERE Â BECOMES THIS LAST SECTION REQUIRED FOR THE COMPLETION OF THE DOUBLING OF THE BARARANTO LINE, WHICH IS INDISPENSABLE FOR THE FULL DEVELOPMENT OF RAIL TRANSPORT, BOTH AT REGIONAL LEVEL AND AT THE LEVEL OF THE LINK BETWEEN THE PRODUCTION AND TRADE AREAS OF APULIA AND CALABRIA AND THE RES...

20 March 2020

17 March 2020

12 March 2020

6 March 2020