Revision history of "NEET-WORK- EXPERIENTIAL LABORATORIES TO RESUME WITH MUOSVERSI-PROJECT A" (Q1979411)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:3706:37, 9 October 2024DG Regio talk contribs 59,236 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:3706:37, 9 October 2024DG Regio talk contribs 59,236 bytes 0 Set a claim value: summary (P836): Dadas as características dos NEET, o projecto não prevê a formação de um posto de trabalho específico. — REFLEXAR OS INTERESSES, OPORTUNIDADES E COMPETÊNCIAS DO PARTICIPANTE INDIVIDUAL NOS SETORES/FÍGUROS PROFISSIONAIS ESPECÍFICOS, PARA FACILITAR A DEFINIÇÃO DAS OBRAS PRÁTICAS PREVISTAS NO CONVITE À APRESENTAÇÃO DE CANDIDATURAS NÃO EX ANTE, MAS ATRAVÉS DA CONCLUSÃO, DURANTE O PROJETO, DE UM PACTO PLENÁRIO ENTRE TODOS OS PARTICIPANTES E A REDE DE PRO...

7 March 2024

11 June 2023

26 April 2023

8 April 2023

4 July 2022

  • curprev 13:2213:22, 4 July 2022DG Regio talk contribs 56,630 bytes +37,320 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 June 2022

10 February 2022

24 January 2022

23 December 2021

22 December 2021

13 December 2021

1 November 2020

15 July 2020

8 June 2020

24 March 2020

  • curprev 11:4711:47, 24 March 2020DG Regio talk contribs 10,659 bytes +1,273 Created claim: summary (P836): GIVEN THE CHARACTERISTICS OF NEETS, THE PROJECT DOES NOT PROVIDE FOR THE FORMATION OF A SPECIFIC JOB. — REFLECT THE INTERESTS, OPPORTUNITIES AND COMPETENCIES OF THE INDIVIDUAL PARTICIPANT WITHIN SPECIFIC PROFESSIONAL SECTORS/FIGURES, TO FACILITATE THE DEFINITION OF THE PRACTICAL WORKSHOPS FORESEEN IN THE CALL FOR APPLICATIONS NOT EX-ANTE, BUT THROUGH THE CONCLUSION, DURING THE PROJECT, OF A PLENARY PACT BETWEEN ALL THE PARTICIPANTS AND THE PROJ...
  • curprev 05:0005:00, 24 March 2020DG Regio talk contribs 9,386 bytes +433 Changed an Item

19 March 2020

11 March 2020

6 March 2020