Revision history of "LEAN METHODOLOGIES FOR THE ORGANISATION AND MANAGEMENT OF PRODUCTION" (Q1972985)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:4918:49, 9 October 2024DG Regio talk contribs 45,433 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:4918:49, 9 October 2024DG Regio talk contribs 45,434 bytes −6 Set a claim value: summary (P836): Estes são empregados que trabalham nas áreas-chave da empresa, no comércio, programação e operações que prevêem a necessidade de um conhecimento de LEAN LOGICS e metodologias que estão intimamente relacionados com a indústria 4.0. A FORMAÇÃO AVANÇADA DO PRESENTE TIPO É NECESSÁRIA PARA A PRODUÇÃO E PARA AS TECNOLOGIAS UTILIZADAS NA PRODUÇÃO DO PRODUTO E NA MAXIMIZAÇÃO DOS RESULTADOS DO PROCESSO.

7 March 2024

20 June 2023

11 June 2023

26 April 2023

8 April 2023

4 July 2022

  • curprev 12:1912:19, 4 July 2022DG Regio talk contribs 42,834 bytes +26,931 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 June 2022

10 February 2022

24 January 2022

23 December 2021

22 December 2021

13 December 2021

1 November 2020

24 August 2020

20 August 2020

  • curprev 22:2022:20, 20 August 2020DG Regio talk contribs 10,283 bytes +767 Created claim: summary (P836): THESE ARE EMPLOYEES WORKING IN THE KEY AREAS OF THE COMPANY, IN THE COMMERCIAL, PROGRAMMING AND OPERATIONS THAT FORESEE THE NEED FOR A KNOWLEDGE OF LEAN LOGICS AND METHODOLOGIES THAT ARE CLOSELY RELATED TO INDUSTRY 4.0. ADVANCED TRAINING OF THIS TYPE IS NECESSARY FOR THE PRODUCTION AND FOR THE TECHNOLOGIES USED IN THE PRODUCTION OF THE PRODUCT AND IN THE MAXIMISATION OF THE PROCESS RESULTS., Adding English summary

15 July 2020

8 June 2020

24 March 2020

11 March 2020

6 March 2020