Revision history of "SPORTS SYSTEM SPECIALIST" (Q1959401)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 06:0306:03, 10 October 2024DG Regio talk contribs 59,013 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:0306:03, 10 October 2024DG Regio talk contribs 59,014 bytes +24 Set a claim value: summary (P836): O projecto será elaborado dentro de dois anos. Divide-se em 2000 horas, das quais 1200 na câmara e 800 horas na exploração agrícola. O PROGRAMA DE FORMAÇÃO OBJECTO DE CRIAR O PERFIL TÉCNICO APERFEIÇOADO DO SISTEMA DESPORTIVO, QUE PODE CONCEBER MANUALMENTE E COM SISTEMAS VIRTUAIS CAD, BI E TRÊS DIMENSIONAIS. COMBINAR OS ASPECTOS TÉCNICOS E DESENVOLVER A INDUSTRIALIZAÇÃO DO PRODUTO, DE FORMA CONSISTENTE COM AS REQUISITOS DA SOCIEDADE, COM OS REQUISITO...

22 March 2024

21 June 2023

12 June 2023

26 April 2023

8 April 2023

12 December 2022

  • curprev 15:3715:37, 12 December 2022DG Regio talk contribs 56,375 bytes −1,301 Removed claim: summary (P836): THE DRAFT SHALL BE DRAWN UP IN TWO YEARS. IT IS DIVIDED INTO 2000 HOURS OF WHICH 1200 IN THE CHAMBER AND 800 HOURS ON THE FARM. THE TRAINING PROGRAMME AIMS TO CREATE THE UPPER TECHNICAL PROFILE OF THE SPORTS SYSTEM, WHICH CAN DESIGN BOTH MANUALLY AND WITH CAD, BI AND THREE-DIMENSIONAL VIRTUAL SYSTEMS. TO COMBINE THE TECHNICAL ASPECTS AND DEVELOP THE INDUSTRIALISATION OF THE PRODUCT, IN A MANNER CONSISTENT WITH THE REQUIREMENTS OF THE COMPANY,...

4 July 2022

  • curprev 09:1709:17, 4 July 2022DG Regio talk contribs 57,676 bytes +37,330 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

24 January 2022

23 December 2021

22 December 2021

13 December 2021

1 November 2020

16 July 2020

7 June 2020

23 March 2020

  • curprev 16:0116:01, 23 March 2020DG Regio talk contribs 11,385 bytes +1,300 Created claim: summary (P836): THE DRAFT SHALL BE DRAWN UP IN TWO YEARS. IT IS DIVIDED INTO 2000 HOURS OF WHICH 1200 IN THE CHAMBER AND 800 HOURS ON THE FARM. THE TRAINING PROGRAMME AIMS TO CREATE THE UPPER TECHNICAL PROFILE OF THE SPORTS SYSTEM, WHICH CAN DESIGN BOTH MANUALLY AND WITH CAD, BI AND THREE-DIMENSIONAL VIRTUAL SYSTEMS. TO COMBINE THE TECHNICAL ASPECTS AND DEVELOP THE INDUSTRIALISATION OF THE PRODUCT, IN A MANNER CONSISTENT WITH THE REQUIREMENTS OF THE COMPANY, WI...

21 March 2020

20 March 2020

  • curprev 09:5309:53, 20 March 2020DG Regio talk contribs 9,652 bytes +1,300 Created claim: summary (P836): THE DRAFT SHALL BE DRAWN UP IN TWO YEARS. IT IS DIVIDED INTO 2000 HOURS OF WHICH 1200 IN THE CHAMBER AND 800 HOURS ON THE FARM. THE TRAINING PROGRAMME AIMS TO CREATE THE UPPER TECHNICAL PROFILE OF THE SPORTS SYSTEM, WHICH CAN DESIGN BOTH MANUALLY AND WITH CAD, BI AND THREE-DIMENSIONAL VIRTUAL SYSTEMS. TO COMBINE THE TECHNICAL ASPECTS AND DEVELOP THE INDUSTRIALISATION OF THE PRODUCT, IN A MANNER CONSISTENT WITH THE REQUIREMENTS OF THE COMPANY, WI...

17 March 2020

11 March 2020

6 March 2020