Revision history of "Modernisation of the data centre of HLT Group s.r.o." (Q19432)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:4518:45, 9 October 2024DG Regio talk contribs 43,996 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:4518:45, 9 October 2024DG Regio talk contribs 43,996 bytes +36 Set a claim value: summary (P836): O projeto trata da expansão da capacidade, do desempenho, da segurança e da disponibilidade do atual centro de dados, do aumento da disponibilidade da infraestrutura LAN, do sistema de salvaguarda e da expansão da camada de virtualização do centro de dados do HLT Group s.r.o. a.

7 March 2024

15 January 2024

11 June 2023

17 February 2023

4 July 2022

  • curprev 07:1307:13, 4 July 2022DG Regio talk contribs 41,290 bytes +22,788 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0511:05, 2 December 2021DG Regio talk contribs 14,839 bytes +1,110 Created claim: summary (P836): Das Projekt befasst sich mit der Erweiterung von Kapazität, Leistung, Sicherheit und Verfügbarkeit des aktuellen Rechenzentrums, erhöht die Verfügbarkeit von LAN-Infrastruktur, Backup-System und auch die Erweiterung der Virtualisierungsschicht des Rechenzentrums der HLT Group s.r.o. a., translated_summary
  • curprev 11:0511:05, 2 December 2021DG Regio talk contribs 13,729 bytes +113 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:2019:20, 28 November 2021DG Regio talk contribs 13,616 bytes +1,132 Created claim: summary (P836): Le projet porte sur l’expansion de la capacité, des performances, de la sécurité et de la disponibilité du datacenter actuel, augmentant la disponibilité de l’infrastructure LAN, du système de sauvegarde et aussi l’extension de la couche de virtualisation du centre de données de HLT Group s.r.o. a., translated_summary
  • curprev 19:2019:20, 28 November 2021DG Regio talk contribs 12,484 bytes +114 Changed label, description and/or aliases in fr: translated_label

28 October 2020

22 October 2020

  • curprev 17:0217:02, 22 October 2020DG Regio talk contribs 12,815 bytes +1,076 Created claim: summary (P836): The project deals with expansion of capacity, performance, security and availability of the current data centre, increased availability of LAN infrastructure, backup system and expansion of the virtualisation layer of the data centre of HLT Group s.r.o. a., translated_summary
  • curprev 17:0217:02, 22 October 2020DG Regio talk contribs 11,739 bytes −666 Removed claim: summary (P836): The project addresses the extension of the capacity, the performance, the safety and availability of the current data centre, the increase of the availability of LAN infrastructure, the back-up system, as well as the expansion of the virtualisation layer of the data centre of HLT Group s.r.o.., remove_old_english_translation
  • curprev 08:1908:19, 22 October 2020DG Regio talk contribs 12,405 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:1908:19, 22 October 2020DG Regio talk contribs 12,294 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 11:5011:50, 25 February 2020DG Regio talk contribs 11,127 bytes +666 Created claim: summary (P836): The project addresses the extension of the capacity, the performance, the safety and availability of the current data centre, the increase of the availability of LAN infrastructure, the back-up system, as well as the expansion of the virtualisation layer of the data centre of HLT Group s.r.o.., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020