11 October 2024

  • curprev 04:2904:29, 11 October 2024DG Regio talk contribs 44,931 bytes −16 Set a claim value: summary (P836): O objetivo do projeto é construir um segundo centro de dados Rondel, que será mais moderno e tecnologicamente desenvolvido em comparação com o seu antecessor, incluindo infraestruturas e sistemas de apoio (energia, arrefecimento, ventilação, sistemas de segurança contra incêndios, etc.). As capacidades de dados de ambos os centros serão espacialmente separadas dentro de um objeto.

23 March 2024

15 January 2024

22 December 2023

6 July 2023

19 June 2023

11 June 2023

20 February 2023

17 February 2023

4 July 2022

  • curprev 07:1207:12, 4 July 2022DG Regio talk contribs 43,287 bytes +24,630 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0511:05, 2 December 2021DG Regio talk contribs 15,577 bytes +1,186 Created claim: summary (P836): Gegenstand des Projekts ist der Bau eines zweiten Rondel-Rechenzentrums, das im Vergleich zu seinem Vorgänger moderner und technologisch weiterentwickelt sein wird, einschließlich Infrastruktur- und Unterstützungssystemen (Strom, Kühlung, Lüftung, Brandschutzsysteme usw.). Die Datenkapazitäten beider Zentren werden räumlich innerhalb eines Objekts getrennt., translated_summary
  • curprev 11:0511:05, 2 December 2021DG Regio talk contribs 14,391 bytes +112 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:2019:20, 28 November 2021DG Regio talk contribs 14,279 bytes +1,229 Created claim: summary (P836): Le projet a pour objet la construction d’un deuxième data center Rondel, qui sera plus moderne et technologiquement développé par rapport à son prédécesseur, y compris les infrastructures et les systèmes de soutien (puissance, refroidissement, ventilation, systèmes de sécurité incendie, etc.). Les capacités de données des deux centres seront séparées spatialement au sein d’un même objet., translated_summary
  • curprev 19:2019:20, 28 November 2021DG Regio talk contribs 13,050 bytes +119 Changed label, description and/or aliases in fr: translated_label

28 October 2020

22 October 2020

  • curprev 17:0217:02, 22 October 2020DG Regio talk contribs 13,376 bytes +1,160 Created claim: summary (P836): The object of the project is to build a second data centre Rondel, which will be more modern and technologically developed compared to its predecessor, including infrastructure and support systems (power, cooling, ventilation, fire safety systems, etc.). The data capacities of both centres will be spatially separated within one object. a., translated_summary
  • curprev 17:0217:02, 22 October 2020DG Regio talk contribs 12,216 bytes −699 Removed claim: summary (P836): The project aims at building a second RONDEL data centre, which will be more modern and technologically advanced than its predecessor, including infrastructure and support systems (drinking, cooling, ventilation, fire safety systems, etc.). The data capacities of the two centres will be spatially separated in a single object., remove_old_english_translation
  • curprev 08:1908:19, 22 October 2020DG Regio talk contribs 12,915 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:1908:19, 22 October 2020DG Regio talk contribs 12,804 bytes −107 Changed label, description and/or aliases in 1 language: remove_english_label

16 July 2020

19 June 2020

7 June 2020

26 March 2020

3 March 2020

25 February 2020

  • curprev 11:5011:50, 25 February 2020DG Regio talk contribs 11,225 bytes +699 Created claim: summary (P836): The project aims at building a second RONDEL data centre, which will be more modern and technologically advanced than its predecessor, including infrastructure and support systems (drinking, cooling, ventilation, fire safety systems, etc.). The data capacities of the two centres will be spatially separated in a single object., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020