Revision history of "Design — Construction of a local infrastructure for sheaths and fibre optics" (Q192819)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

16 May 2022

13 January 2022

12 January 2022

6 December 2021

1 December 2021

  • curprev 06:2206:22, 1 December 2021DG Regio talk contribs 13,996 bytes +1,656 Created claim: summary (P836): Ziel dieser Operation ist der Ausbau einer Scheideinfrastruktur im Gebiet der Stadt Saint Laurent du Maroni. Das Projekt ist in zwei Schwerpunkte unterteilt, deren Durchführung nicht zeitlich begrenzt ist. Im Rahmen der ersten Achse muss der Auftragnehmer eine Scheide- und Glasfaserinfrastruktur für 44 städtische Kulturerbestätten errichten, die miteinander verbunden werden müssen („kommunale Verbindung“). Im Rahmen der zweiten Achse muss der Au...

27 November 2021

  • curprev 11:0811:08, 27 November 2021DG Regio talk contribs 12,340 bytes −1,706 Removed claim: summary (P836): Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est Divisé en deux axes, dont la réalization n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux („interconnexion municipale“). Dans le...

26 November 2021

  • curprev 21:4121:41, 26 November 2021DG Regio talk contribs 14,046 bytes +1,706 Created claim: summary (P836): Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est Divisé en deux axes, dont la réalization n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux („interconnexion municipale“). Dans le c...
  • curprev 13:3113:31, 26 November 2021DG Regio talk contribs 12,340 bytes +144 Changed label, description and/or aliases in de: translated_label

29 October 2020

13 October 2020

  • curprev 10:5910:59, 13 October 2020DG Regio talk contribs 12,630 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5910:59, 13 October 2020DG Regio talk contribs 12,508 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5910:59, 13 October 2020DG Regio talk contribs 12,642 bytes +1,612 Created claim: summary (P836): The purpose of this operation is to deploy a crap infrastructure within the territory of the City of Saint Laurent du Maroni. The project is divided into two axes, the realisation of which is not temporally sequenced. As part of the first axis, the licensee will be required to deploy crap and fibre-optic infrastructure for 44 municipal heritage sites, to be linked to each other (“municipal interconnection”). As part of the second axis, the holde...
  • curprev 10:5910:59, 13 October 2020DG Regio talk contribs 11,030 bytes −1,149 Removed claim: summary (P836): The purpose of this operation is to deploy an infrastructure of ducts within the territory of the town of Saint Laurent du Maroni. The project is divided into two axes, the completion of which is not carried out on a temporary basis. Under the first axis, the holder will have to deploy a duct and fibre optic infrastructure for 44 municipal heritage sites, to be linked together (“municipal interconnection”). Under the second axis, the holder wi...

14 July 2020

17 June 2020

16 June 2020

10 June 2020

29 May 2020

26 March 2020

26 February 2020

25 February 2020

  • curprev 09:2309:23, 25 February 2020DG Regio talk contribs 7,788 bytes +1,149 Created claim: summary (P836): The purpose of this operation is to deploy an infrastructure of ducts within the territory of the town of Saint Laurent du Maroni. The project is divided into two axes, the completion of which is not carried out on a temporary basis. Under the first axis, the holder will have to deploy a duct and fibre optic infrastructure for 44 municipal heritage sites, to be linked together (“municipal interconnection”). Under the second axis, the holder will...

24 February 2020

17 February 2020

30 January 2020

15 January 2020