Revision history of "Transfer of steam pipeline to hot water – Sand" (Q19060)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 17:2217:22, 3 July 2022DG Regio talk contribs 48,876 bytes +28,609 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 16,486 bytes +1,401 Created claim: summary (P836): Das eingereichte Projekt löst den Wechsel des Heizmediums in der Stadt Písek. Die bestehende Dampfverteilung wird schrittweise durch eine neu gebaute Warmwasserverteilung in der vorisolierten Rohrtechnik ersetzt. Die neue Warmwasserverteilung wird parallel zur bestehenden Dampfleitung betrieben. Aufgrund der Versorgung mit Jitex und der Siedlung Hradiště wird nur der Wirbeldampfkanal beibehalten. Das Projekt ist in drei Phasen der Umsetzung jede...
  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 15,085 bytes +112 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 14,973 bytes +1,478 Created claim: summary (P836): Le projet soumis résout le changement de milieu de chauffage dans la ville de Písek. La distribution de vapeur existante sera progressivement remplacée par une distribution d’eau chaude nouvellement construite dans la technologie des conduites pré-isolées. La nouvelle distribution d’eau chaude sera effectuée en parallèle avec le pipeline de vapeur existant. En raison de la fourniture de Jitex et de la colonie Hradiště, seul le conduit de vapeur...
  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 13,495 bytes +120 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 13,828 bytes +1,421 Created claim: summary (P836): The submitted project deals with the change of heating media in the town of Písek. The existing steam distribution will be gradually replaced by a newly built hot water distribution in pre-insulated pipe technology. The new hot water distribution will be conducted in conjunction with the existing steam pipeline. Due to the supply of Jitex and the settlement Hradiště, only the backbone steam pipeline will be preserved. The project is divided into...
  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 12,407 bytes −960 Removed claim: summary (P836): The proposed project addresses the change of the heating medium in Písek. The existing steam distribution will gradually be replaced by a newly constructed hot-water distribution in the pre-insulated pipe technology. The new hot water distribution will be driven in conjunction with the existing gap. Only the spine will be kept as the Hrady site is supplied with an Jitexu and Hradiste site. The project is divided into 3 implementation phases af...
  • curprev 09:2109:21, 22 October 2020DG Regio talk contribs 13,367 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:2109:21, 22 October 2020DG Regio talk contribs 13,260 bytes −97 Changed label, description and/or aliases in 1 language: remove_english_label

16 July 2020

19 June 2020

7 June 2020

26 March 2020

3 March 2020

25 February 2020

  • curprev 11:5711:57, 25 February 2020DG Regio talk contribs 11,655 bytes +960 Created claim: summary (P836): The proposed project addresses the change of the heating medium in Písek. The existing steam distribution will gradually be replaced by a newly constructed hot-water distribution in the pre-insulated pipe technology. The new hot water distribution will be driven in conjunction with the existing gap. Only the spine will be kept as the Hrady site is supplied with an Jitexu and Hradiste site. The project is divided into 3 implementation phases afte...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020