Revision history of "Hot water connection CZT objects Apex, Harantova and N. 2595 Sand" (Q19058)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 17:1717:17, 3 July 2022DG Regio talk contribs 44,308 bytes +25,056 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 16,169 bytes +1,184 Created claim: summary (P836): Im Rahmen des geplanten Übergangs von Dampf zu heißem Wasser im Bereich des Heißwassers Ost und des technischen Zustands der ursprünglichen Dampf- und Kondensatverteilung zu Kunden-Nr. 2595, VS Ha-rantova und Apex sollen bestehende Dampfleitungen durch Heißwasserleitungen aus vorisolierten Rohren ersetzen. Die ursprüngliche Route wird 242 m rekonstruiert., translated_summary
  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 14,985 bytes +130 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 14,855 bytes +1,223 Created claim: summary (P836): Dans le cadre de la transition prévue de la vapeur à l’eau chaude dans la zone de l’eau chaude Est et de l’état technique de la distribution initiale de vapeur et de condensats aux clients no. 2595, VS Ha-rantova et Apex devraient remplacer les conduites de vapeur existantes par des conduites d’eau chaude provenant de tuyaux préisolés. L’itinéraire d’origine sera reconstruit 242 m., translated_summary
  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 13,632 bytes +135 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 13,950 bytes +1,191 Created claim: summary (P836): Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a., translated_summary
  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 12,759 bytes −712 Removed claim: summary (P836): In the context of a planned transition from steam to hot water in the East of the East and the technical condition of the original steam and a condenser medium to the customers. 2595, Ho-rantova and Apex are planned to replace the existing steam ducts from the pre-insulated pipelines. To be reconstructed 242 m from the original grass. a., remove_old_english_translation
  • curprev 09:2109:21, 22 October 2020DG Regio talk contribs 13,471 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:2109:21, 22 October 2020DG Regio talk contribs 13,347 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label

16 July 2020

19 June 2020

7 June 2020

26 March 2020

3 March 2020

25 February 2020

  • curprev 11:5711:57, 25 February 2020DG Regio talk contribs 11,769 bytes +712 Created claim: summary (P836): In the context of a planned transition from steam to hot water in the East of the East and the technical condition of the original steam and a condenser medium to the customers. 2595, Ho-rantova and Apex are planned to replace the existing steam ducts from the pre-insulated pipelines. To be reconstructed 242 m from the original grass. a., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020