Revision history of "Modernisation of Szt Karviná and Havířov – II. part" (Q19051)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 16:5116:51, 3 July 2022DG Regio talk contribs 41,733 bytes +23,445 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 14,475 bytes +1,133 Created claim: summary (P836): Rekonstruktion der Rohrleitungsverteilung und Modernisierung von elektrischen und Maschinenteilen von Transferstationen. Ziel des Projekts ist es, Wärmeverluste und Eigenverbrauch von Strom zu reduzieren und die Betriebssicherheit durch die Umsetzung der vorgeschlagenen Maßnahmen in den SZT-Netzen zu erhöhen., translated_summary
  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 13,342 bytes +116 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 13,226 bytes +1,176 Created claim: summary (P836): Reconstruction de la distribution des canalisations et modernisation des parties électriques et machines des stations de transfert. L’objectif du projet est de réduire les pertes de chaleur et l’autoconsommation d’électricité et d’accroître la fiabilité opérationnelle grâce à la mise en œuvre des mesures proposées sur les réseaux SZT., translated_summary
  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 12,050 bytes +115 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 12,384 bytes +1,120 Created claim: summary (P836): Reconstruction of pipeline distribution and modernisation of electrical and machine parts of transmission stations. The aim of the project is to reduce thermal losses and consumption of electricity and increase operation reliability through the implementation of proposed measures on SZT networks. a., translated_summary
  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 11,264 bytes −673 Removed claim: summary (P836): The reconstruction of the pipelines and the modernisation of the electrical and machinery parts of the transmission stations. The aim of the project is to reduce heat loss and self-consumption and to increase the reliability of the operation, by implementing the proposed measures on the SZT networks., remove_old_english_translation
  • curprev 09:2109:21, 22 October 2020DG Regio talk contribs 11,937 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:2109:21, 22 October 2020DG Regio talk contribs 11,822 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 11:5711:57, 25 February 2020DG Regio talk contribs 10,652 bytes +673 Created claim: summary (P836): The reconstruction of the pipelines and the modernisation of the electrical and machinery parts of the transmission stations. The aim of the project is to reduce heat loss and self-consumption and to increase the reliability of the operation, by implementing the proposed measures on the SZT networks., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020