Revision history of "Szt – hot water connection and VS – AC Blue Star" (Q19048)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5915:59, 7 October 2024DG Regio talk contribs 44,743 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:5915:59, 7 October 2024DG Regio talk contribs 44,742 bytes +10 Set a claim value: summary (P836): Ligação de um novo ponto de amostragem utilizando um tubo de água quente de 175,5 bm. O evento também inclui a instalação da estação de transferência de objetos e a potência de cerca de 800 kWt. O recém-construído centro administrativo Blue Star está localizado na intersecção de Mánesova e Lidická tř. a.

12 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 16:4316:43, 3 July 2022DG Regio talk contribs 42,060 bytes +23,132 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 15,052 bytes +1,164 Created claim: summary (P836): Anschluss einer neuen Probenahmestelle über ein Heißwasserrohr mit einer Länge von 175,5 bm. Teil der Veranstaltung ist auch die Installation der Objektübertragungsstation und die Leistung von ca. 800 kWt. Das neu erbaute Gebäude des Verwaltungszentrums Modrá Star befindet sich an der Kreuzung der Straßen Mánesova und Lidická tř. a., translated_summary
  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 13,888 bytes +111 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 13,777 bytes +1,215 Created claim: summary (P836): Raccordement d’un nouveau point de prélèvement à l’aide d’une conduite d’eau chaude d’une longueur de 175,5 bm. Une partie de l’événement est également l’installation de la station de transfert d’objets et la puissance d’env. 800 kWt. Le bâtiment nouvellement construit du centre administratif Modrá Star est situé à la jonction des rues Mánesova et Lidická tř. a., translated_summary
  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 12,562 bytes +110 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 12,901 bytes +1,102 Created claim: summary (P836): Connection of a new sampling point using a hot water pipe of 175,5 bm. The event also includes the installation of the object transfer station and power approx. 800 kWt. The newly built Blue Star administrative centre is located at the intersection of Mánesova and Lidická tř. a., translated_summary
  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 11,799 bytes −697 Removed claim: summary (P836): The addition of a new sampling point using a hydronic line of 175,5 bp. The event includes the installation of the site transfer station and the power output of approximately. 800 kWt. The newly constructed construction of the Centre of the Blue star lies at the intersection of the streets of Mánesov and Lidická secti. a., remove_old_english_translation
  • curprev 09:2109:21, 22 October 2020DG Regio talk contribs 12,496 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:2109:21, 22 October 2020DG Regio talk contribs 12,385 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 11:5711:57, 25 February 2020DG Regio talk contribs 11,235 bytes +697 Created claim: summary (P836): The addition of a new sampling point using a hydronic line of 175,5 bp. The event includes the installation of the site transfer station and the power output of approximately. 800 kWt. The newly constructed construction of the Centre of the Blue star lies at the intersection of the streets of Mánesov and Lidická secti. a., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020