Revision history of "SAKO hot water exchange station and power output" (Q19034)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

12 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 16:0616:06, 3 July 2022DG Regio talk contribs 40,630 bytes +22,228 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 14,776 bytes +1,093 Created claim: summary (P836): Mit dem Projekt wird die Leistung der Verbrennungsanlage SAKO Brno, a.s. mittels einer neuen Warmwassertauscherstation (HVS) und durch die Verteilung der Energie in heißem Wasser (HV) durch eine neue Pipeline in den angrenzenden Bezirk Líšeň und Vinohrady umgesetzt. a., translated_summary
  • curprev 10:0010:00, 2 December 2021DG Regio talk contribs 13,683 bytes +102 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 13,581 bytes +1,134 Created claim: summary (P836): Le projet met en œuvre la production de l’usine d’incinération SAKO Brno, a.s. au moyen d’une nouvelle station d’échange d’eau chaude (HVS) et en distribuant l’électricité dans l’eau chaude (HV) par l’intermédiaire d’un nouveau gazoduc vers le district adjacent de Líšeň et Vinohrady. a., translated_summary
  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 12,447 bytes +122 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 12,774 bytes +1,058 Created claim: summary (P836): The project implements the performance of the incinerator SAKO Brno, a.s. using a new hot water exchanger station (HVS) and conducting power in hot water (HV) through a new pipeline to the adjacent city district Líšeň and Vinohrady. a., translated_summary
  • curprev 17:1917:19, 22 October 2020DG Regio talk contribs 11,716 bytes −627 Removed claim: summary (P836): The project results in the performance of the management of the incinerator in Brno, a.s. using the new hot water transfer station (HVS) and the discharge of hot water in hot water (HV) by a new pipe to the adjacent urban part of Líšň and Vinohrady. a., remove_old_english_translation
  • curprev 09:2009:20, 22 October 2020DG Regio talk contribs 12,343 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:2009:20, 22 October 2020DG Regio talk contribs 12,236 bytes −100 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 11:5711:57, 25 February 2020DG Regio talk contribs 11,053 bytes +627 Created claim: summary (P836): The project results in the performance of the management of the incinerator in Brno, a.s. using the new hot water transfer station (HVS) and the discharge of hot water in hot water (HV) by a new pipe to the adjacent urban part of Líšň and Vinohrady. a., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020