Revision history of "Modernisation of Cologne and reduction of own resource consumption" (Q19011)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3518:35, 9 October 2024DG Regio talk contribs 46,557 bytes +13 Set a claim value: summary (P836): Reconstrução e modernização, especialmente de redes primárias, estações de permutadores, construção de ligações, instalação de tecnologias para garantir o fornecimento de calor à cidade de Kolín. O objectivo do projecto é aumentar a fiabilidade do funcionamento através da aplicação das medidas propostas em matéria de recursos e de redes. Não há riscos. a.

22 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 15:2215:22, 3 July 2022DG Regio talk contribs 43,872 bytes +24,590 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5909:59, 2 December 2021DG Regio talk contribs 15,244 bytes +1,170 Created claim: summary (P836): Umbau und Modernisierung von Primärnetzen, Wärmetauschstationen, Anschlussbau, Installation von Technologien zur Sicherstellung der Wärmeversorgung der Stadt Köln. Ziel des Projekts ist es, die Zuverlässigkeit des Vorhabens durch die Umsetzung der vorgeschlagenen Maßnahmen an den Quellen und Netzen des SZT zu erhöhen. Die Risiken sind nicht., translated_summary
  • curprev 09:5909:59, 2 December 2021DG Regio talk contribs 14,074 bytes +129 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 13,945 bytes +1,230 Created claim: summary (P836): Reconstruction et modernisation des réseaux primaires, des stations d’échange de chaleur, construction de connexions, installation de technologies pour assurer l’approvisionnement en chaleur de la ville de Cologne. L’objectif du projet est d’accroître la fiabilité de l’opération par la mise en œuvre des mesures proposées sur les sources et les réseaux de la SZT. Les risques ne le sont pas., translated_summary
  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 12,715 bytes +145 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:1817:18, 22 October 2020DG Regio talk contribs 13,019 bytes +1,172 Created claim: summary (P836): Reconstruction and modernisation especially of primary networks, exchanger stations, construction of connections, installation of technologies to ensure the supply of heat to the city of Kolín. The aim of the project is to increase the reliability of operation by implementing the proposed measures on resources and on networks. There are no risks. a., translated_summary
  • curprev 17:1817:18, 22 October 2020DG Regio talk contribs 11,847 bytes −733 Removed claim: summary (P836): Reconstruction and modernisation of, in particular, primary networks, exchange stations, construction of connections, installation of technologies to ensure the supply of heat to the City of Cologne. The aim of the project is to increase the reliability of the operation, by implementing the proposed measures on resources and on the SZT networks. The risks. a., remove_old_english_translation
  • curprev 09:2009:20, 22 October 2020DG Regio talk contribs 12,580 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:2009:20, 22 October 2020DG Regio talk contribs 12,455 bytes −130 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

26 March 2020

19 March 2020

25 February 2020

  • curprev 11:5611:56, 25 February 2020DG Regio talk contribs 11,325 bytes +733 Created claim: summary (P836): Reconstruction and modernisation of, in particular, primary networks, exchange stations, construction of connections, installation of technologies to ensure the supply of heat to the City of Cologne. The aim of the project is to increase the reliability of the operation, by implementing the proposed measures on resources and on the SZT networks. The risks. a., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020