Revision history of "Sand – hot water East" (Q19003)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5515:55, 7 October 2024DG Regio talk contribs 50,546 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:5515:55, 7 October 2024DG Regio talk contribs 50,544 bytes −1 Set a claim value: summary (P836): O objetivo da construção acima é a transição do fornecimento de vapor para água quente na área dos conjuntos habitacionais Sul, Dr. Horáková, Čapkova, Za Kaplička e América II. A área será abastecida com calor do novo sistema de distribuição de água quente, em um sistema de dutos pré-isolados de dois tubos armazenados livremente na rota de arroz moído do canal de vapor ou calor secundário existente. A nova conduta de água quente substituirá a actual...

7 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 15:1015:10, 3 July 2022DG Regio talk contribs 48,618 bytes +28,088 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5809:58, 2 December 2021DG Regio talk contribs 16,863 bytes +1,435 Created claim: summary (P836): Zweck des oben genannten Baus ist der Übergang von der Dampfversorgung von Wärme zu Warmwasser im Bereich der Wohnsiedlung Jih, Dr. Horáková, Čapkova, Za Kaplička und Amerika II. Das Gebiet wird mit Wärme aus einem neuen Warmwasserverteilungssystem versorgt, in einem System aus vorisolierten Rohren mit zwei Rohren, die frei in den Bodenreglern auf der Strecke eines bestehenden Dampf- oder Sekundärwärmekanals gelagert werden. Das neue Warmwasser...
  • curprev 09:5809:58, 2 December 2021DG Regio talk contribs 15,428 bytes +83 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 15,345 bytes +1,467 Created claim: summary (P836): L’objectif de la construction susmentionnée est de passer de l’alimentation en chaleur à l’eau chaude dans la zone du lotissement Jih, Dr. Horáková, Čapkova, Za Kaplička et America II. La zone sera alimentée en chaleur provenant d’un nouveau système de distribution d’eau chaude, dans un système de conduites pré-isolées à deux tuyaux entreposées librement dans les chevrons souterrains sur la voie d’une vapeur existante ou d’un canal thermique sec...
  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 13,878 bytes +83 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:1017:10, 22 October 2020DG Regio talk contribs 14,248 bytes +1,375 Created claim: summary (P836): The purpose of the above construction is the transition from steam supply to hot water in the area of housing estates South, Dr. Horáková, Čapkova, Za Kaplička and America II. The area will be supplied with heat from the new hot water distribution system, in a two-tube pre-insulated pipeline system stored freely in the ground rice route of the existing steam or secondary heat channel. The new hot water pipeline will replace the current steam pip...
  • curprev 17:1017:10, 22 October 2020DG Regio talk contribs 12,873 bytes −890 Removed claim: summary (P836): The purpose of the above construction works is the transition from heat to hot water in the area in the South, Dr Horáková, Čapkova, on behalf of the Land and America II. The area will be supplied by heat from a new hot water distribution system, in a system of two-tube pre-insulated pipes stored freely in the route of an existing steam or secondary heat channel. The new mountain range will replace the current water vapour, the need to adapt t...
  • curprev 09:1709:17, 22 October 2020DG Regio talk contribs 13,763 bytes +82 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1709:17, 22 October 2020DG Regio talk contribs 13,681 bytes −79 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

16 July 2020

19 June 2020

7 June 2020

26 March 2020

19 March 2020

3 March 2020

25 February 2020

  • curprev 11:5411:54, 25 February 2020DG Regio talk contribs 12,076 bytes +890 Created claim: summary (P836): The purpose of the above construction works is the transition from heat to hot water in the area in the South, Dr Horáková, Čapkova, on behalf of the Land and America II. The area will be supplied by heat from a new hot water distribution system, in a system of two-tube pre-insulated pipes stored freely in the route of an existing steam or secondary heat channel. The new mountain range will replace the current water vapour, the need to adapt tec...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020