7 March 2024

15 January 2024

22 December 2023

6 July 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 12:3812:38, 3 July 2022DG Regio talk contribs 51,708 bytes +30,112 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4809:48, 2 December 2021DG Regio talk contribs 16,512 bytes +1,424 Created claim: summary (P836): Ziel des Projekts ist die Installation und Inbetriebnahme einer KWK-Quelle mit einer Wärmeleistung von 43,5 kWt und einer elektrischen Leistung von 2 kWe (Energie im Brennstoff – Wärmeleistung 50 kWt) mit der ORC-Einheit, um die Versorgung mit elektrischer und thermischer Energie zu gewährleisten, die Installation und Inbetriebnahme von Photovoltaik-Panels mit einer elektrischen Leistung von 10 kWe, die Anwendung einer intelligenten Steuerung fü...
  • curprev 09:4809:48, 2 December 2021DG Regio talk contribs 15,088 bytes +220 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 14,868 bytes +1,489 Created claim: summary (P836): L’objectif du projet est l’installation et la mise en service d’une source de cogénération d’une puissance thermique de 43,5 kWt et d’une puissance électrique de 2 kWe (énergie en combustible — puissance thermique de 50 kWt) à l’aide de l’unité ORC pour assurer l’approvisionnement en énergie électrique et thermique, l’installation et la mise en service de panneaux photovoltaïques d’une puissance électrique de 10 kWe, l’application d’un système d...
  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 13,379 bytes +270 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:0617:06, 22 October 2020DG Regio talk contribs 13,558 bytes +1,355 Created claim: summary (P836): The aim of the project is the installation and commissioning of a power source on KVET with heat output of 43.5 kWt and power output of 2 kWe (energy in fuel – thermal input 50 kWt) using the ORC unit to ensure the supply of electrical and thermal energy, installation and commissioning of photovoltaic panels with electrical output of 10 kWe, application of intelligent control system of production and consumption of heat and electricity with accu...
  • curprev 17:0617:06, 22 October 2020DG Regio talk contribs 12,203 bytes −809 Removed claim: summary (P836): The project aims at installing and making the source of heat output 43.5 kWt and el. 2 kWe (energy in fuel — thermal input — thermal input of 50 kWt) using the ORC unit to ensure the supply of electricity and heat, installation of photovoltaic panels with electrical output of 10 kWe, an intelligent control system for the production and consumption of heat and power with energy storage and the interconnection of the subject sites., remove_old_e...
  • curprev 09:0409:04, 22 October 2020DG Regio talk contribs 13,012 bytes +229 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:0409:04, 22 October 2020DG Regio talk contribs 12,783 bytes −232 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 11:3611:36, 25 February 2020DG Regio talk contribs 11,725 bytes +809 Created claim: summary (P836): The project aims at installing and making the source of heat output 43.5 kWt and el. 2 kWe (energy in fuel — thermal input — thermal input of 50 kWt) using the ORC unit to ensure the supply of electricity and heat, installation of photovoltaic panels with electrical output of 10 kWe, an intelligent control system for the production and consumption of heat and power with energy storage and the interconnection of the subject sites., Adding English...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020