Revision history of "Generation of electricity from FVE including its accumulation" (Q18860)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:4416:44, 10 October 2024DG Regio talk contribs 43,639 bytes +5 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma central fotovoltaica nos telhados do complexo de produção de Hoříně, incluindo a instalação de um sistema de baterias para armazenamento de energia e de uma estação de carregamento para veículos elétricos.

22 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 12:3512:35, 3 July 2022DG Regio talk contribs 39,938 bytes +22,562 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 12,543 bytes +1,103 Created claim: summary (P836): Le projet a pour objet la construction d’une centrale photovoltaïque sur les toits du site de production de Hořín, y compris l’installation d’un système de batteries pour le stockage de l’énergie et d’une borne de recharge pour la recharge des véhicules électriques., translated_summary
  • curprev 19:1119:11, 28 November 2021DG Regio talk contribs 11,440 bytes +132 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

24 September 2020

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 11:3611:36, 25 February 2020DG Regio talk contribs 9,989 bytes +589 Created claim: summary (P836): The aim of the project is the construction of a photovoltaic power plant on the roofs of a production site in Hoříž, including the installation of an energy storage system and charging points for electric charging., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020