Revision history of "ENERGY ACCUMULATION AND CONSTRUCTION OF THE COMPANY’S FVE TORE" (Q18846)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5515:55, 7 October 2024DG Regio talk contribs 45,004 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:5515:55, 7 October 2024DG Regio talk contribs 45,003 bytes +1 Set a claim value: summary (P836): O projeto apresentado consiste na implementação de uma central fotovoltaica com potência instalada de 30,74 kWp associada à instalação de tecnologia de armazenamento de energia com uma capacidade de 40,2 kWh e de uma estação de carregamento para veículos elétricos com uma capacidade de 22 kW, que será adquirida na fase seguinte.

23 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 12:1712:17, 3 July 2022DG Regio talk contribs 42,331 bytes +23,558 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4709:47, 2 December 2021DG Regio talk contribs 14,985 bytes +1,143 Created claim: summary (P836): Das vorliegende Projekt umfasst die Errichtung eines Photovoltaik-Kraftwerks mit einer installierten Leistung von 30,74 kWp, das mit dem Einbau einer 40,2 kWh-Energiespeichertechnologie und einer Ladestation für ein Elektroauto mit einer Leistung von 22 kW verbunden ist, die in der nächsten Phase erworben werden soll., translated_summary
  • curprev 09:4709:47, 2 December 2021DG Regio talk contribs 13,842 bytes +104 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 13,738 bytes +1,165 Created claim: summary (P836): Le présent projet consiste en la mise en place d’une centrale photovoltaïque d’une capacité installée de 30,74 kWp reliée à l’installation d’une technologie de stockage d’énergie de 40,2 kWh et d’une borne de recharge pour une voiture électrique d’une capacité de 22 kW, qui sera acquise au cours de la prochaine étape., translated_summary
  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 12,573 bytes +112 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:0617:06, 22 October 2020DG Regio talk contribs 12,910 bytes +1,142 Created claim: summary (P836): The submitted project consists of the implementation of a photovoltaic power plant with installed power of 30.74 kWp associated with the installation of energy storage technology with a capacity of 40.2 kWh and a charging station for electric vehicles with a capacity of 22 kW, which will be acquired in the next stage. a., translated_summary
  • curprev 17:0617:06, 22 October 2020DG Regio talk contribs 11,768 bytes −670 Removed claim: summary (P836): The present project consists of the implementation of a photovoltaic power plant with a capacity of 30,74 kWp related to the installation of an energy storage technology with a capacity of 40.2 kWh, and an electric car charging station with a capacity of 22 kW, to be acquired in the next stages., remove_old_english_translation
  • curprev 09:0409:04, 22 October 2020DG Regio talk contribs 12,438 bytes +123 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:0409:04, 22 October 2020DG Regio talk contribs 12,315 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 11:3511:35, 25 February 2020DG Regio talk contribs 11,152 bytes +670 Created claim: summary (P836): The present project consists of the implementation of a photovoltaic power plant with a capacity of 30,74 kWp related to the installation of an energy storage technology with a capacity of 40.2 kWh, and an electric car charging station with a capacity of 22 kW, to be acquired in the next stages., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020