Revision history of "ALL TO SCHOLANN" (Q1876751)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

9 December 2022

13 July 2022

3 July 2022

  • curprev 10:2710:27, 3 July 2022DG Regio talk contribs 50,019 bytes +31,783 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

29 December 2020

1 November 2020

16 July 2020

7 June 2020

25 March 2020

  • curprev 08:2308:23, 25 March 2020DG Regio talk contribs 10,452 bytes +1,026 Created claim: summary (P836): EXTENSION OF THE INFRASTRUCTURE AND ACCESS POINTS TO THE LANWLAN NETWORK IN ALL OF THE ELLISTITUTO NETWORK IN ALL OF THE DELLISTITUTO NETWORK IN ALL OF THE DELLISTITUTO NETWORK IN ORDER TO COMPLETE A STRUCTURED CABLING WITH ELECTRICAL WIRING AND NETWORK CABLING FOR THE VARIOUS RACKS UP TO THE POSITION OF THE GYMNASIUMS OF ACCESS POINT ROUTER IN ORDER TO COVER THE AREAS NOT COVERED BY INSTALLING NEW ELECTRIC SOCKETS THE STRUCTURED CABLING UP TO M...

21 March 2020

19 March 2020

10 March 2020

2 March 2020