Revision history of "COMPUTER HIGHWAYS" (Q1876263)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

9 December 2022

13 July 2022

3 July 2022

  • curprev 10:1810:18, 3 July 2022DG Regio talk contribs 49,674 bytes +30,629 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

1 November 2020

15 July 2020

7 June 2020

25 March 2020

  • curprev 08:1908:19, 25 March 2020DG Regio talk contribs 10,630 bytes +1,001 Created claim: summary (P836): THE BELLINI SCHOOL HAS ITS HEADQUARTERS IN A STABLE DEPCA, WITH A LARGE EXTENSION OF THE FIRST EDITION OF THE CLSBS 20 CALL FOR A LARGE NUMBER OF EQUIPMENT EQUIPPED WITH A 33 LIM ARRAY OF EQUIPMENT EQUIPPED TO CONNECT TO THE 5 LIM LINES DOZENS OF INDIVIDUAL DEVICES THAT HAVE BEEN EQUIPPED WITH LIMITS TO BUILD THE WIFI STRUCTURE THAT WAS MAINLY BASED ON OWN FUNDS, AND ENABLED ACCESS BY MEANS OF ACCESS POINT TO ALL OF THE EXISTING CABLE NETWORKS,...

21 March 2020

19 March 2020

10 March 2020

2 March 2020