Revision history of "OPTICAL FIBRE SCHOOL" (Q1875459)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

13 July 2022

3 July 2022

  • curprev 10:0310:03, 3 July 2022DG Regio talk contribs 52,931 bytes +33,612 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

29 December 2020

1 November 2020

15 July 2020

7 June 2020

25 March 2020

  • curprev 08:1608:16, 25 March 2020DG Regio talk contribs 10,454 bytes +1,195 Created claim: summary (P836): IN THE FOLLOWING FOLLOW UP FROM THE GMRA CONSORTIUM THROUGH LUNIVERIT OF THE CASSINO AND SOUTHERN LAZIO STUDIES FROM OUR HIGH SCHOOL, IT IS NECESSARY TO COMPLETE THE COVERAGE OF SOME CLASSROOMS AND SPACES THAT HAVE NOT BEEN MET BY THE WIFI SIGNAL, ADAPTING THE CURRENT EQUIPMENT DESIGNED FOR TRADITIONAL ADSL CONNECTIONS, WITH NEW AND PI PERFORMING DEVICES SUITABLE FOR CONNECTIONS SUCH AS THAT IN THE POSSESSION OF OUR INSTITUTE, THE PROJECT IS THE...

21 March 2020

19 March 2020

10 March 2020

2 March 2020