Revision history of "SCHOOL 100 CONNECTED" (Q1875281)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

13 July 2022

3 July 2022

  • curprev 10:0010:00, 3 July 2022DG Regio talk contribs 47,828 bytes +29,650 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

29 December 2020

1 November 2020

15 July 2020

7 June 2020

25 March 2020

  • curprev 08:1508:15, 25 March 2020DG Regio talk contribs 10,191 bytes +1,047 Created claim: summary (P836): THE AIM OF THE PROJECT IS TO EXPAND THE EXISTING LAN AND WLAN IN ORDER TO CONNECT TO ALL THE ENVIRONMENTS OF THE SCUOLALIIS SAN BENEDETTO, THE FIRST TWO BUILDINGS FRRA007014 AND FRTA007032 ARE LOCATED IN CASILINA AND HOST THE PROF AGROAMB AND CHIMICOBIOLOG THESE TWO BUILDINGS ARE IN THE THIRD BUILDINGS OF THE FRRH007029 BUILDING AND HOST THE THREE CLASSES OF THE HOUSE IN THOSE CLASSES FOR WHICH IT IS NOT POSSIBLE TO CONNECT TO THE FOURTH BUILDIN...

21 March 2020

19 March 2020

10 March 2020

2 March 2020