Revision history of "EXTENSION OF THE LANWAN NETWORK" (Q1875168)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

13 July 2022

3 July 2022

  • curprev 09:5809:58, 3 July 2022DG Regio talk contribs 39,981 bytes +25,134 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

11 February 2022

9 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

1 November 2020

7 June 2020

25 March 2020

  • curprev 08:1408:14, 25 March 2020DG Regio talk contribs 8,761 bytes +723 Created claim: summary (P836): THE PROJECT AIMS AT EXTENDING AND CONSOLIDATING THE EXISTING INFRASTRUCTURE OF THE EXISTING WIFI NETWORK ON THE BASIS OF THE TECHNOLOGICAL ELEMENTS DESCRIBED ABOVE, WHICH IS LINKED TO THE EXISTING CABLING OF THE EXISTING CABLING, WHICH IS LINKED TO THE NEW DISTRIBUTED IPS DISTRIBUTED IN REPLACEMENT OF THE OUTDATED SWITCH OF FAST ETHERNET NETWORKS., Adding English summary

21 March 2020

19 March 2020

10 March 2020

2 March 2020