Revision history of "TO BE LINKED AT ALL TIMES" (Q1874359)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

9 December 2022

13 July 2022

3 July 2022

  • curprev 09:4309:43, 3 July 2022DG Regio talk contribs 51,747 bytes +32,288 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

1 November 2020

15 July 2020

7 June 2020

25 March 2020

  • curprev 08:1208:12, 25 March 2020DG Regio talk contribs 10,705 bytes +1,083 Created claim: summary (P836): THE PROJECT INVOLVES THE CONSTRUCTION OF 1 CABLING IN CAT 6 COMPLETE RACK-19 INCHES AND 20 LOCATIONS IN THE SURVEYORS OF THE SECOND FLOOR OF THE PALAZZINA VICE-PRESIDENT FOR THE 2-FLOOR OF THE 6-FLOOR AND THE 2 GROUND FLOOR FOR NEW BACKBONE NETWORKS IN THE 1 FLOOR AND TO THE GROUND FLOOR IN THE FLOOR IN THE CENTRE OF THE GROUND FLOOR AND THE RACK OF THE SECOND FLOOR 3 BACKBONE PLAN FOR MAGNA AND THE RACK OF THE SECOND FLOOR 4 FLOOR 2 ALLAAWU, 5...

21 March 2020

19 March 2020

10 March 2020

2 March 2020