Revision history of "DEPLOYMENT OF A WIRED NETWORK IN TOURIST TECHNICIANS" (Q1870845)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

3 July 2022

  • curprev 09:0209:02, 3 July 2022DG Regio talk contribs 48,861 bytes +30,870 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

29 December 2020

1 November 2020

15 July 2020

7 June 2020

24 March 2020

  • curprev 22:2322:23, 24 March 2020DG Regio talk contribs 10,108 bytes +999 Created claim: summary (P836): THE REPORTING OF CABLES IN THE MAIN HARDWARE COMPONENTS ENABLES THE DATA TO BE EXCHANGED BETWEEN THE MAIN HARDWARE COMPONENTS AND THE CABLES CONNECT THE RELEVANT ALLARMADIETTO ITEMS THAT CONTAIN THE EQUIPMENT FOR THE OPERATION OF THE NETWORK, WHICH CONTAINS THE EQUIPMENT FOR THE OPERATION OF THE NETWORK. THE HIGH LEVEL OF TRANSMISSION IS NOT AFFECTED BY INTERFERENCE WITH THE USE OF BULKY CABLES AND THAT IT DOES NOT ALLOW FOR THE USE OF THE COST...

21 March 2020

19 March 2020

10 March 2020

2 March 2020