Revision history of "SCHOLANTIC TECHNOLOGY" (Q1869612)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

12 July 2022

3 July 2022

  • curprev 08:3908:39, 3 July 2022DG Regio talk contribs 51,352 bytes +32,558 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

29 December 2020

1 November 2020

15 July 2020

7 June 2020

24 March 2020

  • curprev 22:1622:16, 24 March 2020DG Regio talk contribs 10,360 bytes +1,087 Created claim: summary (P836): THE MAJORANA FASCITELLI HAS A CABLE NETWORK WITHIN THE MAIN AND PARTIAL HEADQUARTERS IN THE LOCATION OF THE MAIN HEADQUARTERS LOCATED NEAR THE HEADQUARTERS IN THE ISIS MATTEIMI WHERE IT IS MAINLY CONNECTED WITH ADSL CONNECTIONS IN PARTICULAR IN LABORATORIES AND IN CLASS 20 AT THE TIME. THEREFORE, ALL THE ROOMS WITH A LIMITED OR OFTEN ABSENT SIGNAL HAVE BEEN SERVED WITH A LIMITED OR OFTEN ABSENT SIGNAL FOR THE CREATION OF A NETWORK INFRASTRUCTURE...

21 March 2020

19 March 2020

10 March 2020

2 March 2020