Revision history of "SAVE PIERALISI CONNECTION" (Q1869529)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

12 July 2022

3 July 2022

  • curprev 08:3808:38, 3 July 2022DG Regio talk contribs 55,009 bytes +35,985 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

23 December 2021

22 December 2021

10 December 2021

1 November 2020

15 July 2020

7 June 2020

24 March 2020

  • curprev 21:4221:42, 24 March 2020DG Regio talk contribs 10,457 bytes +1,182 Created claim: summary (P836): BUILDING A SECURE AND SCALABLE SECURE NETWORK INFRASTRUCTURE TO COMPLEMENT THE EXISTING SAR PART OF THE EXISTING SAR PART, THE BASIS FOR THE CREATION AND USE OF DIGITAL LEARNING ENVIRONMENTS ADAPTED TO THE NEEDS OF FLESSIBIITIR DELELEDUELA DIGITALELA SECURITY FOR ACCESS SHALL BE FILTERED AND CONTROLLED BY A FIREWALL TO AVOID INAPPROPRIATE USE OF THE INTERNETPER NETWORK FOR CONNECTING THE TWO REMOTE LOCATIONS, TO CREATE A VIRTUAL AND SECURE VIRTU...

21 March 2020

19 March 2020

10 March 2020

2 March 2020