Revision history of "ICT LIM AND LAN" (Q1865311)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

12 July 2022

3 July 2022

  • curprev 07:2807:28, 3 July 2022DG Regio talk contribs 51,899 bytes +32,922 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

22 December 2021

20 December 2021

10 December 2021

1 November 2020

15 July 2020

7 June 2020

24 March 2020

  • curprev 21:5621:56, 24 March 2020DG Regio talk contribs 10,426 bytes +1,175 Created claim: summary (P836): OUR INSTITUTION AS A LARGE NUMBER OF OTHER SCHOOLS DEVELOPED BY IPS PHYSICALLY SEPARATE FROM EACH OTHER FOR THE DISTANCE BETWEEN THESE BUILDINGS RANGES FROM THE APPROXIMATELY 100 METRES WHICH SEPARATES THE SEAT FROM THE BRANCH TO SEVERAL KILOMETRES FROM THE SAME HEAD OFFICE TO THE DETACHED OFFICES OF AGNANO PISCARELLI AND SAN MARTINOLA TECHNOLOGY THAT HAS BECOME AN INTEGRAL AND ALWAYS IP INTEGRAL TO THE PROPER AND EFFICIENT FUNCTIONING OF THE EN...

21 March 2020

19 March 2020

10 March 2020

2 March 2020