Revision history of "LANWLAN" (Q1864008)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

12 July 2022

3 July 2022

  • curprev 07:1907:19, 3 July 2022DG Regio talk contribs 45,806 bytes +28,351 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

22 December 2021

20 December 2021

10 December 2021

1 November 2020

15 July 2020

7 June 2020

24 March 2020

  • curprev 21:5521:55, 24 March 2020DG Regio talk contribs 9,996 bytes +929 Created claim: summary (P836): THE PROJECT CONSISTS OF THE CONSTRUCTION OF THE FOLLOWING COMPONENTIFIC CABLING SYSTEM, WHICH PROVIDES FOR THE INSTALLATION OF 1 SERVERS TO BE INSTALLED IN THE BASEMENT AT THE BASEMENT LEVEL OF ALL THE ACCESSORIES AND COMPLETE WITH A 3 NRO UPS, A VERTICAL CABLING SYSTEM LINKING THE SERVER WITH EACH OF THE FLOOR CABINETS WITH A LAN CONNECTION A HORIZONTAL CABLE SYSTEM PROVIDING FOR THE PROVISION OF A 4 NETWORK ACCESS POINT NETWORK OPERATED IN THE...

21 March 2020

19 March 2020

10 March 2020

2 March 2020