Revision history of "Smart line conditioner" (Q18635)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:3006:30, 9 October 2024DG Regio talk contribs 46,359 bytes +15 Set a claim value: summary (P836): O objeto do projeto é a instalação de 27 condicionadores de linha em vários locais na área de distribuição da E.ON Distribuce, a.s. O condicionador de linha funciona como um estabilizador de potência de baixa tensão, que compensa as alterações na tensão da rede utilizando transformadores ligados em série alimentados pelo conversor de energia elétrica. O projeto é implementado a fim de melhorar a qualidade do fornecimento de eletricidade aos clientes...

12 March 2024

22 December 2023

19 June 2023

11 June 2023

1 June 2023

17 February 2023

3 July 2022

  • curprev 07:1607:16, 3 July 2022DG Regio talk contribs 44,773 bytes +26,001 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:2111:21, 2 December 2021DG Regio talk contribs 14,554 bytes +1,294 Created claim: summary (P836): Gegenstand des Projekts ist die Installation von 27 Linienkonditionierern an verschiedenen Standorten im Verteilerbereich von E.ON Distribuce, a.s. Der Line Conditioner arbeitet als Niederspannungsstabilisator, der Änderungen der Netzspannung durch seriell angeschlossene Transformatoren ausgleicht, die über einen Stromwandler angetrieben werden. Das Projekt wird durchgeführt, um die Qualität der Stromversorgung der Kunden an den betroffenen Stan...
  • curprev 11:2111:21, 2 December 2021DG Regio talk contribs 13,260 bytes +81 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 13,179 bytes +1,355 Created claim: summary (P836): L’objet du projet est l’installation de 27 conditionneurs de ligne en différents endroits dans la zone de distribution d’E.ON Distribuce, a.s. Le conditionneur de ligne fonctionne comme un stabilisateur de puissance basse tension, qui compense les changements de tension du secteur par des transformateurs connectés en série alimentés par un convertisseur d’énergie électrique. Le projet est réalisé dans le but d’améliorer la qualité de l’approvisi...
  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 11,824 bytes +92 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4916:49, 22 October 2020DG Regio talk contribs 12,181 bytes +1,279 Created claim: summary (P836): The subject of the project is the installation of 27 line conditioners in various locations in the distribution area of E.ON Distribuce, a.s. The line conditioner works as a low voltage power stabiliser, which compensates for changes in the network voltage using serially connected transformers powered by the electric power converter. The project is implemented in order to improve the quality of electricity supply to customers in the affected loc...
  • curprev 16:4916:49, 22 October 2020DG Regio talk contribs 10,902 bytes −873 Removed claim: summary (P836): The subject of the project is the installation of 27 line-based conditioners in E.ON Distribuce, a.s., based as a low voltage performance stabiliser at various locations in the distribution territory of E.ON Distribuce, a.s., which compensates for the changes in the network voltage by means of a series of power transformers supplied with electric power converters. The project is being implemented in order to improve the quality of the supply o...
  • curprev 08:5208:52, 22 October 2020DG Regio talk contribs 11,775 bytes +81 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5208:52, 22 October 2020DG Regio talk contribs 11,694 bytes −82 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

26 March 2020

19 March 2020

25 February 2020

  • curprev 13:0213:02, 25 February 2020DG Regio talk contribs 10,509 bytes +873 Created claim: summary (P836): The subject of the project is the installation of 27 line-based conditioners in E.ON Distribuce, a.s., based as a low voltage performance stabiliser at various locations in the distribution territory of E.ON Distribuce, a.s., which compensates for the changes in the network voltage by means of a series of power transformers supplied with electric power converters. The project is being implemented in order to improve the quality of the supply of...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020