Revision history of "Implementation of measures to improve reliability, awareness and implementation of the balance and optimisation of operation in the ENERGO KD local distribution system" (Q18632)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:3006:30, 9 October 2024DG Regio talk contribs 52,142 bytes −3 Changed label, description and/or aliases in pt
  • curprev 06:3006:30, 9 October 2024DG Regio talk contribs 52,145 bytes −4 Set a claim value: summary (P836): No âmbito do projeto, será implementado todo o complexo de medidas para implementar elementos inteligentes no sistema de distribuição local da ENERGO KD. As principais áreas de implementação são a construção de um novo centro de balanço de dados ligado a um sistema de medição inteligente, complementando muitas outras funcionalidades tecnológicas. A segunda área importante é a modernização da gestão do despacho e do sistema operacional, que é complem...

7 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 07:1307:13, 3 July 2022DG Regio talk contribs 50,455 bytes +29,781 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:2111:21, 2 December 2021DG Regio talk contribs 15,847 bytes +1,338 Created claim: summary (P836): Im Rahmen des Projekts wird das gesamte Maßnahmenpaket zur Umsetzung intelligenter Elemente im lokalen Verteilersystem ENERGO KD umgesetzt. Die wichtigsten Umsetzungsbereiche sind der Bau eines neuen Rechenbilanzzentrums, das mit einem intelligenten Messsystem verbunden ist und durch viele andere technologische Funktionen ergänzt wird. Der zweite wichtige Bereich ist die Modernisierung des Dispatchings und des Betriebsmanagements des Systems, er...
  • curprev 11:2111:21, 2 December 2021DG Regio talk contribs 14,509 bytes +238 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 14,271 bytes +1,417 Created claim: summary (P836): Dans le cadre du projet, l’ensemble des mesures pour la mise en œuvre d’éléments intelligents dans le système de distribution local ENERGO KD sera mis en œuvre. Les principaux domaines de mise en œuvre sont la construction d’un nouveau centre de bilan de données relié à un système de mesure intelligent, complété par de nombreuses autres fonctionnalités technologiques. Le deuxième domaine important est la modernisation de l’expédition et de la ge...
  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 12,854 bytes +266 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4916:49, 22 October 2020DG Regio talk contribs 13,037 bytes +1,325 Created claim: summary (P836): Within the project, the entire complex of measures to implement intelligent elements in the local ENERGO KD distribution system will be implemented. The main areas of implementation are the construction of a new data balance centre linked to an intelligent measuring system, supplementing many other technological functionalities. The second important area is modernisation of dispatch and operational system management, which is complemented by new...
  • curprev 16:4916:49, 22 October 2020DG Regio talk contribs 11,712 bytes −887 Removed claim: summary (P836): The project will implement the whole complex of the smart grid implementation measures in the local energy-producing local distribution system. The main areas of implementation are the creation of a new data balancing centre based on a smart metering system with the addition of a number of other technological functionalities. The second major area is the modernisation of the control and the operational management of the system, which is comple...
  • curprev 08:5208:52, 22 October 2020DG Regio talk contribs 12,599 bytes +227 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5208:52, 22 October 2020DG Regio talk contribs 12,372 bytes −233 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 13:0213:02, 25 February 2020DG Regio talk contribs 11,317 bytes +887 Created claim: summary (P836): The project will implement the whole complex of the smart grid implementation measures in the local energy-producing local distribution system. The main areas of implementation are the creation of a new data balancing centre based on a smart metering system with the addition of a number of other technological functionalities. The second major area is the modernisation of the control and the operational management of the system, which is compleme...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020