Revision history of "SEQUINO IS NETWORKED" (Q1863108)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

12 July 2022

3 July 2022

  • curprev 07:1307:13, 3 July 2022DG Regio talk contribs 51,110 bytes +32,292 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

7 February 2022

23 January 2022

22 December 2021

20 December 2021

10 December 2021

1 November 2020

15 July 2020

7 June 2020

24 March 2020

  • curprev 21:3221:32, 24 March 2020DG Regio talk contribs 10,360 bytes +1,089 Created claim: summary (P836): WITH THE PROJECT, SEQUINO IS INTENDED TO BUILD A LAN EO WLAN IN THE SCHOOLS OF THE SCHOOL WITHOUT CONNECESTIVIT AND EXTEND THE WIRELESS NETWORK IN THE IMS EQUIPPED WITH A CONNECTION BUT IN WHICH IT IS PARTICULARLY OBSOLETE IN THIS CONNECTION THAT THE 15 CLASSES DISTRIBUTED IN TWO FLOORS ARE NOT REACHED BY CONNECTING TO THE CURRENT STATE IN FACT THE CLASSES DISTRIBUTED IN TWO FLOORS, AND OF THE ‘CONSUMER’, WHICH ARE NOT IN A POSITION TO COPE WITH...

21 March 2020

19 March 2020

10 March 2020

2 March 2020